Figure 2.18

The connector (CN1) of PSAU-60 (PS1)

44

Figure 2.19

The terminal block (TN) of PSAU-60 (PS1)

44

Figure 2.20

The connector (CN44) of PSAU-60 (PS1)

44

Figure 2.21

The connector (CN27) of DPAU-60 (SW1)

44

Figure 3.1

UPS terminal designation

50

Figure 3.2.1

Diagram of input/output bus bars and terminal blocks (80-225kVA)

51

Figure 3.2.2

Diagram of input/output bus bars and terminal blocks (300kVA)

52

Figure 3.2.3

Diagram of input/output bus bars and terminal blocks (500kVA)

53

Figure 3.2.4

Diagram of input/output bus bars and terminal blocks (750kVA)

54

Figure 3.3.1

Detail of the main cabinet bus bars (300kVA)

55

Figure 3.3.2

Detail of the main cabinet bus bars (500kVA)

56

Figure 3.3.3

Detail of the main cabinet bus bars (750kVA)

57

Figure 3.4.1

Bus bar connection between main cabinet and landing cabinet (300kVA)

58

Figure 3.4.2

Bus bar connection between main cabinet and landing cabinet (500kVA)

59

Figure 3.4.3

Bus bar connection between main cabinet and landing cabinet (750kVA)

60

Figure 3.5

Power wire & control wire inter-connect between UPS and battery

61

Figure 3.6

Power wire connections (parallel system configuration)

62

Figure 3.7.1

Power and control wire connections for 4 units in MMS (80-225kVA)

63

Figure 3.7.2a Power and control wire connections for 2 units in MMS (300-750kVA)

64

Figure 3.7.2b Detail of IFAU-09 Control Wire Connections for 2 units in MMS (300-750kVA)

65

Figure 3.7.3a Power and control wire connections for 3-4 units in MMS (300-750kVA)

66

Figure 3.7.3b Detail of IFAU-09 Control Wire Connections for 3-4 units in MMS (300-750kVA)...

67

Figure 3.7.4a Power and control wire connections for 5-8 units in MMS (300-750kVA)

68

Figure 3.7.4b Detail of IFAU-09 Control Wire Connections for 5-8 units in MMS (300-750kVA)...

69

Figure 3.8

Circuit protectors location

70

Figure 3.9

LCD screen (MMS operation)

73

iv

G9000 Installation and Operation Manual

Page 10
Image 10
Toshiba G9000 operation manual Power wire connections parallel system configuration