G9000 Installation and Operation Manual 71
B) Shut-down Procedure
If a total UPS shutdown is required, verify that the critical load is OFF.
a.) Press the "START/STOP" icon from the Main Menu or the Operation Men u on the LCD.
b.) On the LCD panel, press “START/STOP” icon, and then select “SHUTDOWN GUIDANCEico n.
(Refer to Figure 2.3)
c.) Follow the SHUTDOWN GUIDANCEuntil Inverter stops. The UPS will simultaneous ly transfer
to Bypass operation.
d.) In general, only the Inverter will be stopped and the Converter wil l remain energized to charge the
batteries.
When "REMOTE OPERATION MODE" is displayed on the LCD panel, the inverter
start operation can only be performed remotely. If local inverter stop operation is
required (at the UPS), select "LOCAL ONLY" or REMOTE & LOCALin the
OPERATION MENU.
e.) If stopping both the Inverter and Converter is required, open the Batter y Disconnect circuit
breaker (CB2) manually in accordance with guidance.
Verify the load is OFF if the next step is to be performed.
Power to the load has been supplied through the bypass line. Power to load will be lost
after execution of the next step. The load will drop.
f.) If a dual source is feeding the UPS, open the External AC Input Circuit Breaker (user supplied)
manually.
g.) If turning off all power to the critical load is desired, open the Externa l Bypass Input Circuit
Breaker (user supplied) manually.
In bypass mode, all UPS power terminals are still alive. Lethal voltages are present.
De-energize all external sources of AC and DC power. Before removing the covers, wait
5 minutes after de-energizing. Check no-voltage before handling UPS. Be careful of
the devices even when the UPS has been de-energized, since internal devices may be
energized.
!
NOTE
CAUTION
WARNING