Toshiba G9000 operation manual Transportation and Installation, Transportation Installation

Models: G9000

1 104
Download 104 pages 52.29 Kb
Page 55
Image 55

3 INSTALLATION AND OPERATION

3.1TRANSPORTATION AND INSTALLATION

TABLE 3.1 How to transport and install the system

Transportation

Installation

Transport unit with forklift.

Using the pre-drilled four holes in the UPS

If carry by overhead crane, use four M12

channel base, anchor the unit using

eyebolts. (Not provided)

appropriate hardware. (Not provided)

 

 

Do not transport UPS cabinet laid horizontally.

PROHIBIT

!Cabinets must be maintained upright within ± 15° of the vertical during handling.

NOTE

3.2INSTALLATION PROCEDURE

A)Note the load tolerance of the floor Refer to Table 3.2 for list of UPS weights.

TABLE 3.2 List of UPS weights

UPS Capacity (kVA)

80

100

160

225

300

500

750

Weight (lbs)

855

855

1160

1230

2260

3360

4250

 

 

 

 

 

 

 

 

B)Minimum clearance required for ventilation

Right side

1 in. (25 mm) (not required when sidecars are used)

Left side

1 in. (25 mm) (not required when sidecars are used)

Back side

0.0 inch (0 mm)

Top side (80-225kVA)

20 inches (500 mm) (for air flow)

Top side (300-750kVA)

23.6 inches (600 mm) (for air flow)

C)Space requirement for routine maintenance

Allow for the following space at the time of installation.

Front (80-225kVA)

40 inches (1000 mm)

Front (300-750kVA)

42.3 inches (1075 mm)

Sides

0.0 inch (0 mm)

Back side

0.0 inch (0 mm)

Top side

20 inches (50 mm)

G9000 Installation and Operation Manual

45