64 G9000 Installation and Operation Manual FIGURE 3.7.2a Diagram of Power Wire & Control Wire Connections for 2 units in MMS C onfiguration (300-750kVA)
IFAU-09
CN99
CN98
TLBIN
ON
TLAIN
TN1
IOAU-09
5
6
AC
OUTPUT

UPS-1

A
B
C
UPS-1
A
B
C
UPS-2
AC OUTPUT
47
48
49
50
52L1-AX
52L2-AX
Toshiba Tie Cabinet (TTC)
A50
B50
C50
CN97
CN96
TLBOUT
TLAOUT
CN954
CN953
CB2IN
CB1IN
CN952
CN951
CA2IN
CA1IN
CN944
CN943
CB2OUT
CB1OUT
CN942
CN941
CA2OUT
CA1OUT
ON
IFAU-09
CN99
CN98
TLBIN
ON
TLAIN
TN1
IOAU-09
5
6
AC
OUTPUT

UPS-2

A50
B50
C50
CN97
CN96
TLBOUT
TLAOUT
CN954
CN953
CB2IN
CB1IN
CN952
CN951
CA2IN
CA1IN
CN944
CN943
CB2OUT
CB1OUT
CN942
CN941
CA2OUT
CA1OUT
ON
*1
*2
*2
*2
*2
*1

Use Ethernet STP

(Shielded Twisted

Pair) Cable ( Cat 5 or

Cat 6) with RJ45

modular connectors

for all communication

cabling.

Use of UTP

(Unshielded Twisted

Pair) Cable may

cause malfunction.

Total cable length

from UPS-1 to UPS-2

should be within

100m.

*1 Return from the last

UPS module to the first UPS

module (continuous loop).

*2 DIP switch position

UPS-1 and UPS-2 : ON