Test Program for Field.
3.4System Test
To execute the System Test select 01 from the Diagnostic Test Menu, press Enter and follow the directions on the screen. The System Test contains two subtests. Move the highlight bar to the subtest you want to execute and press Enter.
Subtest 01 FAN ON/OFF Checking
Select 1,2,3 to control FAN on/off , 1=Fan on , 2=Fan off , 3=Exit .
| [BD1FAN.EXE] Program Version : 1.0 | ||
| 1: Fan On 2: Fan Off 3: Exit |
|
|
| Fan1 Status On Fan1RPM : 5000 | or | Fan1 Status OFF Fan1RPM : 0 |
| Fan2 Status On Fan2RPM : 4000 | or | Fan2 Status OFF Fan2RPM : 0 |
Subtest 02 | Battery Test |
|
|
This will display battery information for check , press [ESC] to exit .
voltage | : 12522 mV | Remaining capacity alarm | : 400 mAh |
temperature | : 24.4 ‘C | Remaining time alarm | : 10 min |
current | : 1330 mA | Battery mode | : 0 |
average current | : 1327 mA | AtRate | : 0 mA |
relative state of charge | : 93 % | At rate time to full | : 65535 min |
absolute state of charge | : 89 % | At rate time to empty | : 65535 min |
remaining capacity | : 3546 mAh | At rate O. K. | : FFFF |
full charge capacity | : 3800 mAh | Maximun error | : 2 % |
run time to empty | : | Charging current | : 2800 mA |
average time to empty | : | Charging voltage | : 12600 mA |
average time to full | : 101 min. | Manufacturer name | : SANYO |
cycle count | : 10 times | Device name | : NS2P3SZDNVWR |
design capacity | : 4000 mAh | Device chemistry | : LION |
design voltage | : 11100 mV | Manufacturer data | : 0 |
specification information : 2.1 | Manufacture date | : 9/13/2005 | |
serial no. | : 32009 |
|
|
STATUS | : INIT |
|
|
Press [ESC] KEY to exit
Satellite P100 and Satellite Pro P100 Tests and Diagnostics Manual | 11 |