®

Chapter 3

Termination board wiring

After mounting the termination module, wire the termination board. The wiring process consists of wiring the termination board to 24 Vac power, inputs, outputs, and UCMs. This chapter provides information and procedures that enable you to wire the termination board. Figure 14 on page 24 shows all field wiring connections.

Refer to the required and optional supply checklists in Appendix A (Table 15 and Table 16 on page 65) to verify that you have the materials required to wire the Tracker controller. When termination board wiring is complete, use the termination module post-installation checklist in Appendix A (Table 18 on page 70) to verify the wiring.

BMTK-SVN01D-EN

23

Page 31
Image 31
Trane Building Automation System, BMTK-SVN01D-EN manual Termination board wiring