Required supplies

Table 15 lists the supplies required for all Tracker installations.

Table 15. Required supplies checklist

;

Wiring installation

Item

 

 

 

￿

24 Vac

18 AWG (1.02 mm2) wire recommended

￿

 

24 Vac, 40 VA minimum transformer

 

 

 

￿

Comm

Communication wire (see Table 7 on page 30

 

 

and Table 8 on page 31 for specifications)

 

 

 

Optional supplies

Table 16 lists the supplies that may or may not be necessary, depending on the Tracker installation.

Table 16. Optional supplies checklist

;

Inputs/output

Item

wiring installation

 

 

 

￿

Alarm relay wiring

18 AWG (1.02 mm2) wire and metal conduit

 

 

 

￿

Priority shutdown

18—22 AWG (1.02 mm2—0.643 mm2) wire and

 

wiring and

metal conduit

 

Meter input

 

 

 

 

￿

Thermistor wire

18—22 AWG (1.02 mm2—0.643 mm2) twisted

 

 

pair, shielded wire

 

 

 

￿

Alarm relay power

Power supply for alarm relay output (not to

 

supply

exceed 24 Vac)

 

 

 

￿

Alarm relay output

Load for alarm relay output (not to exceed

 

load

1 amp at 24 Vac)

 

 

 

￿

Thermistor

Outdoor air temperature sensor

 

 

 