Chapter 3 Termination board wiring
•The link repeater is limited to 60 devices on either side of the link (120 devices total).
•The link repeater requires an earth ground. The installer should be aware of this before making power connections.
Recommended shield connections are shown in Figure 19. Figure 20 on page 39 shows a
•Reference the installation information that comes with the link repeater (Comm5 repeater installation, 3270 3285).
•Connect the
•Connect the
Figure 19. Connecting communication link shield wiring to repeater
24 Vac
Transformer
Earth ground
Entering shield. Continuous run, typically starting at the Tracker controller.
Leaving shield. Must be connected to the earth ground terminal on the repeater and terminated (insulated from ground) at the last UCM.
Link Repeater
124 VAC
3
Comm
4
5
6
Comm
7
8
9
Legend
= | Transformer | = | Earth ground |
= | Twisted pair, shielded wire | = | Shield ground |
per Trane specifications |
|
| |
|
|
|
38 |
|