Index

E

EIA-232 connection installing, 47 LEDs, 55

electrical conduit installation, 19, 21 electrical interference, 15 Ethernet communication port, 48 Ethernet connection to PC

procedures, 52

I

I/O modules

maximum capacity per controller, 10, 11

I/O options, 26 installation

after, 13 before, 12 checklists, 65–71

direct connection to PC, 47 electrical conduit, 19, 21 Ethernet LAN connection to PC, 52 modem connection to PC, 50

J

jumper function, 58 general, 55

L

LAN communication port, 48 LCI-R, 1, 10, 11

LCI-V, 1, 10, 11 LEDs, 57

CPU status and traffic, 55 display module, 55, 57 EIA-232 status and traffic, 55 main logic board, 55, 57

location choosing, 15

conformance to specifications, 15, 18

controller size accommodation, 16 LonTalk see Comm5 communications

description, 6 mounting, 41–42

maintenance, 63 memory backup, 9 meter, utility pulse

wire requirements, 26 wiring procedures, 28

model numbers, 8

modem connection to PC, 50 diagram, 49, 51, 52, 53, 54 procedures, 50

RJ-11 communication port, 48 mounting

display module, 43–44 main module, 41–42 specifications, 9 termination module, 15–21

MP503 I/O module, 10, 11

N

Neuron identification, 55

O

operating environment, 9 outdoor air temperature sensor

wire requirements, 26 wiring procedures, 28

overheating, 15

P

PC communication port RJ-11, 48

RJ-12, 48

PC workstation connection diagram, 49, 51, 52, 53, 54 direct, 47

Ethernet LAN, 52 modem, 50 wiring, 47

post-installation checklist, 13 power requirements, 9, 25 pre-installation wiring notes, 69 priority shutdown device input

wire requirements, 26 wiring procedures, 27

M

main logic board, 57 jumpers, 58 LEDs, 55

service pin buttons, 58 main module

R

rebooting, 55 repeater

connections to Comm5 link shield wiring, 38

daisy-chain connection, 39

76

BMTK-SVN01D-EN

Page 84
Image 84
Trane BMTK-SVN01D-EN, Building Automation System manual Index