Manuals
/
Trane
/
Household Appliance
/
Air Conditioner
Trane
RAUC-C25, RAUC-C50, RAUC-C30, RAUC-C60, RAUC-C20, RAUC-C40 manual Installation, SS-SVX09A-EN
Models:
RAUC-C20
RAUC-C40
RAUC-C25
RAUC-C30
RAUC-C60
RAUC-C50
1
11
112
112
Download
112 pages
31.47 Kb
8
9
10
11
12
13
14
15
<
>
Install
Scroll Compressor Replacement
Warranty
Dimension
Maintenance
Ground Wire
Final System Setup
6RT1 Discharge Air Sensor Assembly
Brazing Procedures
Freezestat Setting
Page 11
Image 11
Installation
Figure 4.
RAUC-C25
Unit Dimensional Data & Recommended Clearances
SS-SVX09A-EN
11
Page 10
Page 12
Page 11
Image 11
Page 10
Page 12
Contents
Air Cooled Condensing Units and EVP Chillers
June
Installation Operation Maintenance
Remote Split System Units
Responsible Refrigerant Practices
Warnings, Cautions and Notices
Grounding Required
Environmental Concerns
SS-SVX09A-EN
Table of Contents
SS-SVX09A-EN
Compressor Nameplate
General Information
Model Number Description
Unit Nameplate
Unit Description
General Information
Evaporator Nameplate
EVP Chiller Applications Only
Unit Clearances
Installation
Unit Inspection
No Step Surface
NOTICE
Unit Dimensions & Weight Information
Installation
Foundation
SS-SVX09A-EN
Installation
SS-SVX09A-EN
Installation
SS-SVX09A-EN
Installation
SS-SVX09A-EN
Installation
SS-SVX09A-EN
Installation
SS-SVX09A-EN
Installation
SS-SVX09A-EN
Installation
SS-SVX09A-EN
Installation
Figure 9. BPHE 20 Evaporator Chiller Dimensions
Note All water connections are Victaulic
Note: All water connections are Victaulic
Installation
Figure 10. BPHE 25 Evaporator Chiller Dimensions
SS-SVX09A-EN
Installation
Figure 11. BPHE 30 Evaporator Chiller Dimensions
Note: All water connections are Victaulic
13.533
Installation
Note: All water connections are Victaulic
SS-SVX09A-EN
827.2
Installation
Note: All water connections are Victaulic
SS-SVX09A-EN
SS-SVX09A-EN
Installation
Figure 14. BPHE 60 Evaporator Chiller Dimensions
Note: All water connections are Victaulic
SS-SVX09A-EN
Installation
Typical Unit Weights & Point Loading Data
Table
Installation
Rigging
Heavy Objects
Heavy Objects
Unit Isolation
Neoprene Isolators
Installation
Heavy Objects
Installation Spring Isolators
Leveling the Unit
Installation
Shipping Fasteners
Compressor Shipping Hardware
Two Manifolded Compressors
Installation
General Unit Requirements
Refrigerant Piping Requirements
Hazardous Voltage
Main Electrical Power Requirements
Hazard of Explosion
EVP Chilled Water Piping Requirements
”No Controls” Units
Ground Wire
Field Installed Control Wiring Requirements
115 Volt Control Wiring All Units
Figure 17. EVP Chiller Piping
Ground Wire
Installation
Grounding Required
Refrigerant Line Components
Low Voltage Wiring AC & DC
Variable Air Volume VAV Units
Constant Volume Units
Thermostatic Expansion Valve TEV
Liquid Line Moisture Indicator Sight Glass
Access Valves Ports
Liquid Line Solenoid Valves
Split System Component Number Definitions
Installation
Suction Line Interconnecting Tubing
Refrigerant Piping
Suction Line Piping
Installation
Liquid Line Interconnecting Tubing
Liquid Line Piping
Installation
SS-SVX09A-EN
Evaporator Piping
Installation
SS-SVX09A-EN
Optional Pressure Gauges
Final Refrigerant Pipe Connections
Installation
Hazard of Explosion
Brazing Procedures
Hazard of Explosion and Deadly Gases
Installation
Hazard of Explosion
Leak Testing Procedure
Installation
Hazard of Explosion
SS-SVX09A-EN
Chilled Water Piping
Installation
SS-SVX09A-EN
Installation
Figure 21. Evaporator Water-PressureDrop
Water Pressure Gauges
Chiller Flow Switch
Water Temperature Sensor
Air Vents
Figure 22. Typical Piping Recommendations
Freezestat
Installation
NOTICE
NOTICE
Final Water Piping Connections
Installation
NOTICE
NOTICE
Field Installed Power Wiring
Installation
NOTICE
Hazardous Voltage
Main Unit Power Wiring
Installation
Installation
Power Wire Sizing and Protection Device
Equations
Calculation #1 MCA, MOP, and RDE
SS-SVX09A-EN
Installation Calculation #2
Disconnect Switch Sizing DSS
Table 8. Electrical Service Sizing Data
Hazardous Voltage
Field Installed Control Wiring
Controls Using 115 VAC
Installation
EVP Circulating Pump Interlock
Supply Fan Interlock
Control options utilizing an Air Handler
EVP Interlocks EVP Flow control 6S58
Hazardous Voltage
Controls using 24 VAC
Controls using DC Analog Input/Outputs
Installation
Table 10. DC Conductors
Economizer Actuator Circuit
Installation
Hazardous Voltage
Temperature Control Parameters
No System Control
Installation
SS-SVX09A-EN
Installation
Refer to Wiring Notes on p.
SS-SVX09A-EN
Installation
Installation
Variable Air Volume Control Honeywell W7100A
Discharge Air Sensor Honeywell 6RT3
Ground Wire
Hazardous Voltage
Suction Line Thermostat
Night Setback
Installation
Installation
EVP Chiller Control
Grounding Required
W7100G Discharge Chilled Water Controller
Ground Wire
Installation
Grounding Required
Chilled Water Temperature Sensor Honeywell 6RT2
Ground Wire
Installation
SS-SVX09A-EN
Outside Air Thermostat 5S57 Field Provided
Installation
Hazardous Voltage
SS-SVX09A-EN
Installation
Thermostat Checkout
Constant Volume Control Honeywell
Thermostat Wiring
Electronic Zone Thermostat Honeywell T7067
SS-SVX09A-EN
Installation
Hazardous Voltage
Discharge Air Sensor Honeywell 6RT1
Installation
Table 11. Q667 Switching Subbase
SS-SVX09A-EN
Installation
SS-SVX09A-EN
Installation
Figure 33. 6RT1 Discharge Air Sensor Assembly
Hazardous Voltage
System Pre-StartProcedures
Compressor Damage
EVP Chiller Applications
NOTICE
System Evacuation Procedures
System Pre-StartProcedures
NOTICE
Figure 34. Typical Vacuum Pump Hookup
Standing Vacuum Test
System Pre-StartProcedures
Figure 35. Evacuation Time vs. Pressure Rise
System Pre-StartProcedures
Hazardous Voltage
SS-SVX09A-EN
System Pre-StartProcedures
Figure 36. W7100A Discharge Air Controller
System Pre-StartProcedures
Hazardous Voltage
Discharge Air Sensor Checkout Honeywell Sensor
Economizer Actuator Checkout
System Pre-StartProcedures
Hazardous Voltage
EVP Chiller Control Checkout Honeywell W7100G
System Pre-StartProcedures
System Pre-StartProcedures
Figure 38. W7100G Chilled Water Controller
Chilled Water Sensor Checkout Honeywell Sensor
System Pre-StartProcedures
Hazardous Voltage
Hazardous Voltage
Switch 1S1
Master Energy Control Checkout
System Pre-StartProcedures
System Pre-StartProcedures
Zone Thermostat Checkout Honeywell T7067
Switch 1S1
SS-SVX09A-EN
Discharge Air Sensor Checkout Honeywell 6RT1
System Pre-StartProcedures
Hazardous Voltage
Resistance
System Pre-StartProcedures
Temperature - Degree F C
Ohms
System Pre-StartProcedures
Voltage Imbalance
Electrical Phasing
Switch 1S1
Economizer Cycle
System Start-Up
Sequence of Operation
VAV W7100A Discharge Air Controller 7U11
Figure 41. W7100A Staging Sequence
Chilled Water Temperature Controller 6U11
System Start-Up
Thermostatic Expansion Valve
Figure 42. W7100G Staging Sequence
Condenser Fans
System Start-Up
System Start-Up
Low Ambient Dampers
Compressor Crankcase Heaters
Pump Down
Hot Gas Bypass Operation
Live Electrical Components
System Start-Up Low Ambient Thermostats
Water
Freezestat Setting
EVP Chiller Applications
System Start-Up
Verifying Proper Supply Fan Rotation
“Air Over” Evaporator Application
Rotating Components
System Airflow Measurement
System Start-Up
Compressor Start-UpAll Systems
Compressor Damage
NOTICE
System Start-Up
Live Electrical Components
Rotating Components
NOTICE
System Start-Up
Subcooling
Measuring Subcooling
Measuring Superheat
System Start-Up
Compressor Oil
Table 13. Pressure Control Switch Settings
Table 15. Minimum starting Ambient Temperature
SS-SVX09A-EN
Table 15. Minimum starting Ambient Temperature
System Start-Up
Table 16. Compressor Sequence
SS-SVX09A-EN
System Start-Up
Figure 45. Typical Compressor Locations
Figure 46. Typical Compressor Terminal Block
SS-SVX09A-EN
System Start-Up
Figure 47. 20 Ton Pressure Curve
SS-SVX09A-EN
System Start-Up
Figure 48. 25 Ton Pressure Curve
SS-SVX09A-EN
System Start-Up
Figure 49. 30Ton Pressure Curve
SS-SVX09A-EN
System Start-Up
Figure 50. 40 Ton Pressure Curve per Circuit
SS-SVX09A-EN
System Start-Up
Figure 51. 50 Ton Pressure Curve per Circuit
SS-SVX09A-EN
System Start-Up
Figure 52. 60 Ton Pressure Curve per Circuit
Table 17. Recommended Operating Setpoints
Final System Setup
System Start-Up
SS-SVX09A-EN
Table 18. Sample Maintenance Log
System Start-Up
At Shutdown
Service & Maintenance
Scroll Compressor Replacement
Compressor Operational Sounds
SS-SVX09A-EN
Service & Maintenance
Figure 53. Suction Line Filter/Drier Installation
Table 19. Compressor Circuit Breaker Data
Service & Maintenance
Fuse Replacement Data
Monthly Maintenance
Air Handling Equipment
Rotating Components
Coil Cleaning
Condensing Unit
Service & Maintenance
Live Electrical Components
Hazardous Pressures
System operation
Service & Maintenance
ACCESSORIES
WARRANTY AND LIABILITY CLAUSE
Numerics
Symbols
Index
Index
June
Literature Order Number
SS-SVX09A-EN
Date