To minimize unit sound and vibration transmission, one of the following installation methods should be used:

1.Install the unit directly on an isolated (detached) concrete pad or on isolated concrete footings located at each unit load point.

2.Install the optional neoprene or spring isolators at each mounting location. Refer to the “Neoprene isolators” or “Spring isolator” section below.

Neoprene Isolators

Install the neoprene isolators at each unit mounting (load) point, using the following procedure:

1. Elevate the unit (one side at a time) to allow access to the base rail mounting holes.

WARNING

Heavy Objects!

Use solid type blocks, i.e. 4" X 4" wood blocks or similar material to prevent collapsing. Keep hands and other body limbs clear of elevated base rail while installing isolators. Failure to do so could result in death or serious injury.

2.Align the mounting holes in the base rail of the unit with the holes in the top of the appropriate isolator. Refer to Table 3 for the appropriate isolator for each load point.

3.Install a 1/2" NC bolt (field supplied) through the base rail of the unit into the threaded bolt hole of the isolator. Position the isolator to allow access to the mounting holes in the base of the isolator, then tighten securely.

4.Lower the unit and isolator onto the mounting surface. The maximum isolator deflection should be approximately 1/4 inch.

5.Secure the isolator to the mounting surface using the base holes in the isolator.

6.Level the unit carefully. Refer to the “Leveling the Unit” section.

7.After the unit is level, tighten the isolator base mounting bolts to secure them to the mounting surface.

Table 3. Typical Neoprene Isolator Selection & Location

 

 

 

Neoprene Isolator Part Number @ Mounting Location

 

 

 

 

 

 

 

 

 

Unit Size

Fin Material

Location 1

Location 2

Location 3

Location 4

Location 5

Location 6

 

 

 

 

 

 

 

 

C20

Al

RDP-3-GRN

RDP-3-GRN

RDP-3-RED

RDP-3-RED

 

 

Cu

RDP-3-GRY

RDP-3-GRN

RDP-3-GRN

RDP-3-RED

 

 

 

 

 

 

 

 

 

 

 

 

 

C25

Al

RDP-3-GRY

RDP-3-GRN

RDP-3-GRN

RDP-3-RED

 

 

Cu

RDP-3-GRY

RDP-3-GRN

RDP-3-GRN

RDP-3-RED

 

 

 

 

 

 

 

 

 

 

 

 

 

C30

Al

RDP-3-GRY

RDP-3-GRY

RDP-3-RED

RDP-3-RED

 

 

Cu

RDP-3-GRY

RDP-3-GRY

RDP-3-RED

RDP-3-GRN

 

 

 

 

 

 

 

 

 

 

 

 

 

C40

Al

RDP-3-GRN

RDP-3-GRN

RDP-3-GRN

RDP-3-GRN

RDP-3-GRN

RDP-3-GRN

Cu

RDP-3-GRN

RDP-3-GRN

RDP-3-GRY

RDP-3-GRN

RDP-3-GRY

RDP-3-GRN

 

 

 

 

 

 

 

 

 

C50

Al

RDP-3-GRY

RDP-3-GRY

RDP-3-GRY

RDP-3-GRN

RDP-3-GRN

RDP-3-GRN

Cu

RDP-3-GRY

RDP-3-GRY

RDP-3-GRY

RDP-3-GRY

RDP-3-GRY

RDP-3-GRY

 

 

 

 

 

 

 

 

 

C60

Al

RDP-3-GRY

RDP-3-GRY

RDP-3-GRY

RDP-3-GRY

RDP-3-GRY

RDP-3-GRN

Cu

RDP-3-GRY

RDP-3-GRY

RDP-3-GRY

RDP-3-GRY

RDP-3-GRY

RDP-3-GRY

 

 

 

 

 

 

 

 

 

Note: Mounting locations correlate with those shown in point loading illustration