Final Water Piping Connections

Installation

Figure 23. Optional Flow Switch Illustration

Figure 24. Freezestat Bulb-well, Temperature Sensor & Well

NOTICE

Failure to use thermal paste could result in erratic temperature sensing resulting in equipment damage.

Final Water Piping Connections

1. All water piping to the system should be flushed thoroughly before making the final connections.

NOTICE

If an acidic commercial flushing solution is used, construct a temporary bypass around the EVP chiller to prevent damage to the internal components of the evaporator.

2. Connect the water pipe to the EVP chiller.