1
14
112
112
Download
112 pages
31.47 Kb
11
12
13
14
15
16
17
18
<
>
Install
Scroll Compressor Replacement
Warranty
Dimension
Maintenance
Ground Wire
Final System Setup
6RT1 Discharge Air Sensor Assembly
Brazing Procedures
Freezestat Setting
Page 14
Image 14
Installation
Figure 7.
RAUC-C50
Unit Dimensional Data & Recommended Clearances
14
SS-SVX09A-EN
Page 13
Page 15
Page 14
Image 14
Page 13
Page 15
Contents
Remote Split System Units
June
Installation Operation Maintenance
Air Cooled Condensing Units and EVP Chillers
Environmental Concerns
Warnings, Cautions and Notices
Grounding Required
Responsible Refrigerant Practices
Table of Contents
SS-SVX09A-EN
SS-SVX09A-EN
Unit Nameplate
General Information
Model Number Description
Compressor Nameplate
EVP Chiller Applications Only
General Information
Evaporator Nameplate
Unit Description
No Step Surface
Installation
Unit Inspection
Unit Clearances
Foundation
Unit Dimensions & Weight Information
Installation
NOTICE
Installation
SS-SVX09A-EN
Installation
SS-SVX09A-EN
Installation
SS-SVX09A-EN
Installation
SS-SVX09A-EN
Installation
SS-SVX09A-EN
Installation
SS-SVX09A-EN
Installation
SS-SVX09A-EN
Note All water connections are Victaulic
Installation
Figure 9. BPHE 20 Evaporator Chiller Dimensions
SS-SVX09A-EN
Note: All water connections are Victaulic
Installation
Figure 10. BPHE 25 Evaporator Chiller Dimensions
Note: All water connections are Victaulic
Installation
Figure 11. BPHE 30 Evaporator Chiller Dimensions
SS-SVX09A-EN
SS-SVX09A-EN
Installation
Note: All water connections are Victaulic
13.533
SS-SVX09A-EN
Installation
Note: All water connections are Victaulic
827.2
Note: All water connections are Victaulic
Installation
Figure 14. BPHE 60 Evaporator Chiller Dimensions
SS-SVX09A-EN
Table
Installation
Typical Unit Weights & Point Loading Data
SS-SVX09A-EN
Installation
Rigging
Heavy Objects
Installation
Unit Isolation
Neoprene Isolators
Heavy Objects
Heavy Objects
Installation Spring Isolators
Leveling the Unit
Two Manifolded Compressors
Shipping Fasteners
Compressor Shipping Hardware
Installation
Installation
General Unit Requirements
Refrigerant Piping Requirements
EVP Chilled Water Piping Requirements
Main Electrical Power Requirements
Hazard of Explosion
Hazardous Voltage
115 Volt Control Wiring All Units
Ground Wire
Field Installed Control Wiring Requirements
”No Controls” Units
Grounding Required
Ground Wire
Installation
Figure 17. EVP Chiller Piping
Constant Volume Units
Low Voltage Wiring AC & DC
Variable Air Volume VAV Units
Refrigerant Line Components
Liquid Line Solenoid Valves
Liquid Line Moisture Indicator Sight Glass
Access Valves Ports
Thermostatic Expansion Valve TEV
Installation
Split System Component Number Definitions
Installation
Refrigerant Piping
Suction Line Piping
Suction Line Interconnecting Tubing
Liquid Line Interconnecting Tubing
Liquid Line Piping
Installation
SS-SVX09A-EN
Evaporator Piping
Installation
Installation
Optional Pressure Gauges
Final Refrigerant Pipe Connections
SS-SVX09A-EN
Installation
Brazing Procedures
Hazard of Explosion and Deadly Gases
Hazard of Explosion
Hazard of Explosion
Leak Testing Procedure
Installation
Hazard of Explosion
SS-SVX09A-EN
Chilled Water Piping
Installation
SS-SVX09A-EN
Installation
Figure 21. Evaporator Water-PressureDrop
Air Vents
Chiller Flow Switch
Water Temperature Sensor
Water Pressure Gauges
NOTICE
Freezestat
Installation
Figure 22. Typical Piping Recommendations
NOTICE
Final Water Piping Connections
Installation
NOTICE
NOTICE
Field Installed Power Wiring
Installation
NOTICE
Hazardous Voltage
Main Unit Power Wiring
Installation
Calculation #1 MCA, MOP, and RDE
Power Wire Sizing and Protection Device
Equations
Installation
Table 8. Electrical Service Sizing Data
Installation Calculation #2
Disconnect Switch Sizing DSS
SS-SVX09A-EN
Installation
Field Installed Control Wiring
Controls Using 115 VAC
Hazardous Voltage
EVP Interlocks EVP Flow control 6S58
Supply Fan Interlock
Control options utilizing an Air Handler
EVP Circulating Pump Interlock
Installation
Controls using 24 VAC
Controls using DC Analog Input/Outputs
Hazardous Voltage
Table 10. DC Conductors
Economizer Actuator Circuit
Installation
Installation
Temperature Control Parameters
No System Control
Hazardous Voltage
SS-SVX09A-EN
Installation
Refer to Wiring Notes on p.
Installation
SS-SVX09A-EN
Ground Wire
Variable Air Volume Control Honeywell W7100A
Discharge Air Sensor Honeywell 6RT3
Installation
Installation
Suction Line Thermostat
Night Setback
Hazardous Voltage
EVP Chiller Control
Installation
Installation
W7100G Discharge Chilled Water Controller
Ground Wire
Grounding Required
Installation
Chilled Water Temperature Sensor Honeywell 6RT2
Ground Wire
Grounding Required
Hazardous Voltage
Outside Air Thermostat 5S57 Field Provided
Installation
SS-SVX09A-EN
Installation
SS-SVX09A-EN
Electronic Zone Thermostat Honeywell T7067
Constant Volume Control Honeywell
Thermostat Wiring
Thermostat Checkout
Installation
SS-SVX09A-EN
Table 11. Q667 Switching Subbase
Discharge Air Sensor Honeywell 6RT1
Installation
Hazardous Voltage
Installation
SS-SVX09A-EN
SS-SVX09A-EN
Installation
Figure 33. 6RT1 Discharge Air Sensor Assembly
EVP Chiller Applications
System Pre-StartProcedures
Compressor Damage
Hazardous Voltage
NOTICE
System Evacuation Procedures
System Pre-StartProcedures
NOTICE
Figure 34. Typical Vacuum Pump Hookup
Standing Vacuum Test
System Pre-StartProcedures
Figure 35. Evacuation Time vs. Pressure Rise
System Pre-StartProcedures
Hazardous Voltage
System Pre-StartProcedures
SS-SVX09A-EN
System Pre-StartProcedures
Figure 36. W7100A Discharge Air Controller
System Pre-StartProcedures
Discharge Air Sensor Checkout Honeywell Sensor
Economizer Actuator Checkout
Hazardous Voltage
Hazardous Voltage
EVP Chiller Control Checkout Honeywell W7100G
System Pre-StartProcedures
System Pre-StartProcedures
Hazardous Voltage
Chilled Water Sensor Checkout Honeywell Sensor
System Pre-StartProcedures
Figure 38. W7100G Chilled Water Controller
System Pre-StartProcedures
Switch 1S1
Master Energy Control Checkout
Hazardous Voltage
System Pre-StartProcedures
Zone Thermostat Checkout Honeywell T7067
Switch 1S1
Hazardous Voltage
Discharge Air Sensor Checkout Honeywell 6RT1
System Pre-StartProcedures
SS-SVX09A-EN
Ohms
System Pre-StartProcedures
Temperature - Degree F C
Resistance
Switch 1S1
Voltage Imbalance
Electrical Phasing
System Pre-StartProcedures
VAV W7100A Discharge Air Controller 7U11
System Start-Up
Sequence of Operation
Economizer Cycle
Thermostatic Expansion Valve
Chilled Water Temperature Controller 6U11
System Start-Up
Figure 41. W7100A Staging Sequence
Figure 42. W7100G Staging Sequence
Condenser Fans
System Start-Up
Pump Down
Low Ambient Dampers
Compressor Crankcase Heaters
System Start-Up
Hot Gas Bypass Operation
Live Electrical Components
System Start-Up Low Ambient Thermostats
System Start-Up
Freezestat Setting
EVP Chiller Applications
Water
System Airflow Measurement
“Air Over” Evaporator Application
Rotating Components
Verifying Proper Supply Fan Rotation
NOTICE
Compressor Start-UpAll Systems
Compressor Damage
System Start-Up
NOTICE
Live Electrical Components
Rotating Components
System Start-Up
Measuring Superheat
Subcooling
Measuring Subcooling
System Start-Up
Table 15. Minimum starting Ambient Temperature
Compressor Oil
Table 13. Pressure Control Switch Settings
System Start-Up
Table 16. Compressor Sequence
Table 15. Minimum starting Ambient Temperature
System Start-Up
SS-SVX09A-EN
Figure 46. Typical Compressor Terminal Block
System Start-Up
Figure 45. Typical Compressor Locations
SS-SVX09A-EN
SS-SVX09A-EN
System Start-Up
Figure 47. 20 Ton Pressure Curve
SS-SVX09A-EN
System Start-Up
Figure 48. 25 Ton Pressure Curve
SS-SVX09A-EN
System Start-Up
Figure 49. 30Ton Pressure Curve
SS-SVX09A-EN
System Start-Up
Figure 50. 40 Ton Pressure Curve per Circuit
SS-SVX09A-EN
System Start-Up
Figure 51. 50 Ton Pressure Curve per Circuit
SS-SVX09A-EN
System Start-Up
Figure 52. 60 Ton Pressure Curve per Circuit
Table 17. Recommended Operating Setpoints
Final System Setup
System Start-Up
SS-SVX09A-EN
Table 18. Sample Maintenance Log
System Start-Up
Compressor Operational Sounds
Service & Maintenance
Scroll Compressor Replacement
At Shutdown
Table 19. Compressor Circuit Breaker Data
Service & Maintenance
Figure 53. Suction Line Filter/Drier Installation
SS-SVX09A-EN
Air Handling Equipment
Fuse Replacement Data
Monthly Maintenance
Service & Maintenance
Service & Maintenance
Coil Cleaning
Condensing Unit
Rotating Components
Service & Maintenance
Hazardous Pressures
System operation
Live Electrical Components
WARRANTY AND LIABILITY CLAUSE
ACCESSORIES
Numerics
Symbols
Index
Index
Date
Literature Order Number
SS-SVX09A-EN
June