Voltage Imbalance

System Pre-Start Procedures

Voltage Imbalance

Excessive three phase voltage imbalance between phases will cause motors to overheat and eventually fail. The maximum allowable voltage imbalance is 2%. Measure and record the voltage between phases 1, 2, and 3 and calculate the amount of imbalance as follows:

%Voltage Imbalance = 100 X [(AV - VD)/(AV)] where; AV (Average Voltage) = (Volt 1 + Volt 2 + Volt 3)/3 V1, V2, V3 = Line Voltage Readings

VD = Line Voltage reading that deviates the farthest from the average voltage.

Example: If the voltage readings of the supply power measured 221, 230, and 227, the average volts would be:

(221 + 230 + 227)/3 = 226 Avg.

VD (reading farthest from average) = 221

The percentage of Imbalance equals:

100 X [(226 - 221)/226)] = 2.2%

The 2.2% imbalance in this example exceeds the maximum allowable imbalance of 2.0%. This much imbalance between phases can equal as much as a 20% current imbalance with a resulting increase in motor winding temperatures that will decrease motor life. If the voltage imbalance is over 2%, notify the proper agencies to correct the voltage problem before operating this equipment.

Electrical Phasing

Proper electrical phasing can be quickly determined and corrected before starting the unit by using an instrument such as an Associated Research Model 45 Phase Sequence Indicator and following the steps below:

[ ] Turn the field supplied disconnect switch that provides power to terminal block 1TB1 to the “Off” position.

[ ] Connect the phase sequence indicator leads to the terminal block or to the “Line” side of the optional factory mounted disconnect switch as follows;

Black (phase A) to L1

Red (phase B) to L2

Yellow (phase C) to L3

[ ] Close the main power disconnect switch or circuit protector switch that provides the supply power to the condensing unit.

WARNING

High Voltage is Present at Terminal Block 1TB1 or Unit Disconnect

Switch 1S1.

To prevent injury or death form electrocution, it is the responsibility of the technician to recognize this hazard and use extreme care when performing service procedures with the electrical power energized.

[ ] Observe the ABC and CBA phase indicator lights on the face of the sequencer. The ABC indicator light will glow if the phase is ABC. If the CBA indicator light glows, open the disconnect switch or circuit protection switch and reverse any two power wires.

[ ] Restore the main electrical power and recheck the phasing. If the phasing is correct.

[ ] Open the main power disconnect switch or circuit protection switch and remove the phase sequence indicator.