period five
Review
notes
Review—Period Four
▲Chiller sequencing
▲ Failure recovery
▲ Contingency planning
▲ System tuning
▲ System optimization ▲ Operator interface
Figure 115
Period Four discussed the issues related to
Remember that you cannot “control your way out of” a poor system design. Although the control system can attempt to minimize the impact of a poor design, it cannot eliminate the cause of the poor design.
Second, even a properly installed system with good components requires
Third, even if the components are working together, the system, not the individual components, needs to be optimized. Remember: the meter is on the building.
Finally, a very important issue that is related to
106 |