Tripp Lite SU20KX Start-Up, Shutdown and Bypass, Control Panel and Breaker Diagrams, parameters

Models: SU40KX SU20KX SU80KX

1 60
Download 60 pages 3.02 Kb
Page 25
Image 25
9 – Start-Up, Shutdown and Bypass

9 – Start-Up, Shutdown and Bypass

 

 

 

1

Warning: The UPS system’s output voltage is set at 220/380V by default. If you require output voltage of 230/400V or 240/415V, you must

 

 

change the UPS system’s output voltage by accessing the output setup menu described in Section 10-5-2. You must place the UPS system in

 

bypass mode before changing the output voltage. Do not connect your equipment to the UPS system’s output until you have set the proper

2

parameters.

 

 

 

9-1 Control Panel and Breaker Diagrams

A “NORMAL” LED

B “BATTERY” LED

C “BYPASS” LED

D “FAULT” LED

E LCD Status Screen

F “ESC” (Escape) Button

G Scroll Buttons (parameters. and 9-1 Control Panel and Breaker Diagrams)

H Enter Button (•A “NORMAL” LED )

I ON Button

J OFF Button

K “EPO” (Emergency Power Off) Button

Q1 Main Input Circuit Breaker Switch

Q2 Bypass Input Circuit Breaker Switch

Q3 Manual Bypass Circuit Breaker Switch

Q4 Output Circuit Breaker Switch

 

E

F

I

K

3

A

 

 

 

 

 

B

 

G

 

 

 

C

 

 

 

 

 

 

 

 

4

D

 

 

 

 

 

 

 

 

 

1

 

H

J

 

 

 

 

 

 

 

 

Control Panel

 

 

5

 

 

 

 

 

Q4

Q3

Q2

 

Q1

6

 

 

 

 

 

Output

Manual

Bypass

 

Main

 

2

Bypass

Input

 

Input

 

Circuit Breaker Switches (UPS System Front Panel)

7

9-2 Preliminary Checklist (Single UPS)

All circuit breaker switches should be off, including the breaker of the external battery cabinet (if present).

Confirm that no voltage potential exists between Neutral and Ground.

Confirm that the input power source matches the rating (voltage, frequency and phase) of the UPS system.

Note: After start-up, the UPS system will perform a brief self-test and display the results on the LCD screen. After a successful self-test, the UPS system will provide AC power to the connected equipment load.

9-3 Standard Start-Up Procedure (Single UPS)

1 If there is an external battery cabinet connected, switch on the circuit breaker A of the external battery cabinet. On the SU20KX or SU40KX, turn on the battery breaker on the back of the UPS.

•E LCD Status ScreenA

1

8

9

10

11

12

2 Confirm that the manual bypass circuit breaker switch Q3 is off.

25

Q3

Output

Manual

Bypass

Main

2

Bypass

Input

Input

 

 

 

13

14

Page 25
Image 25
Tripp Lite SU20KX Start-Up, Shutdown and Bypass, Control Panel and Breaker Diagrams, Preliminary Checklist Single UPS