Tyco 4100U installation manual Maintenance

Models: 4100U

1 180
Download 180 pages 17.54 Kb
Page 149
Image 149
Maintenance

Maintenance

The 4100U system must be kept free from faults and tested on a weekly, monthly and annual basis to verify that it is operating correctly. The tests required by part 8 of the standard AS1851 Maintenance of Fire Protection Equipment are detailed in the 4100U Operator’s Manual, LT0351.

The Operator’s manual also provides detail of report printing and performing tests that are useful for checking the system.

11-5

Page 149
Image 149
Tyco 4100U installation manual Maintenance