Tyco 4100U installation manual Continued, 19.LED/Switch Controller Wiring

Models: 4100U

1 180
Download 180 pages 17.54 Kb
Page 54
Image 54
Figure 2-19. LED/Switch Controller Wiring

Step 6. Installing LED/Switch Modules into Expansion Bays (4100U),

Continued

Wiring Instructions

The following directions are complete instructions on interconnecting display cards and

 

connecting the controller card to a power source.

 

1.

Use Harness 734-008 to connect P2 on the controller card to one of the 4-pin

 

 

connectors on the PDI.

 

2.

If there are multiple controller cards, use Harness 734-036 to connect P3 on the

 

 

controller card to P2 on another controller card.

 

3.

Interconnect all LED/switch display cards with the ribbon cables (provided).

 

 

Connector P1 is the input; connector P2 is the output.

TO PDI CONNECTOR OR ANOTHER

CONTROLLER CARD

HARNESS 734 008

26 - CONDUCTOR

RIBBON CABLE

 

P4

LED/ SWITCH

(reverse side)

 

CONTROLLER

 

 

IN

HARNESS 734- 036

 

TO ANOTHER

LED/ SWITCH

MODULE3

CONTROLLER CARD

 

OUT IN

LED/ SWITCH

MODULE2

OUT IN

LED/ SWITCH

MODULE1

Figure 2-19. LED/Switch Controller Wiring

2-26

Page 54
Image 54
Tyco 4100U installation manual Continued, 19.LED/Switch Controller Wiring