
Tools Needed:
Level
Bottom Section
Before installing the bottom section, the weather seal (may not be included) must be temporarily installed on both jambs and header (see Preparing the Opening on page 10).
Center the bottom section in the door opening. Level section using wooden shims (if necessary) under the bottom section.
Weather seal
Door opening
Level
Wooden shims (if necessary)
INSTALLATION
8 |
| CABLE | FLAGANGLE | Vertical track |
|
Vertical Track |
|
| |||
| 5/16” x |
|
| ||
|
|
|
| ||
Tools Needed: |
|
| LAG SCREWS |
|
|
IMPORTANT: The tops of the |
|
|
| BOTTOM SECTION | |
3/16” Drill Bit | vertical tracks must be level |
|
|
|
|
Power Drill | from side to side. If the bottom |
|
|
|
|
section was shimmed to level it. | Cable |
|
|
| |
7/16” Socket |
|
| 5/8” | ||
The vertical track on the shimmed | drum |
| Roller | ||
|
| ||||
Driver | side, must be raised the height of |
|
| LAG |
|
Tape Measure | the shim. |
|
| SCREW |
|
Level |
|
| VERTICAL | Locations | LAG |
Position the left hand vertical track |
|
| |||
|
| TRACK |
| SCREW | |
| assembly over the rollers of the bottom |
| ASSEMBLY |
| |
|
|
| Locations | ||
| section. Make sure the counterbalance |
|
|
|
|
| cable is located between the rollers |
|
|
|
|
| and the door jamb. Drill 3/16” pilot |
|
|
|
|
| holes for the lag screws. Loosely fasten |
|
| 15r q.i. Flagangle | 15r Fully Adjustable |
| jamb brackets and flagangle to the |
|
| flagangle | |
| jamb using 5/16” x |
|
| Quick install | |
| Tighten lag screw securing bottom | JAMB |
| jamb bracket | |
|
|
|
| ||
| jamb bracket to jamb, to maintain |
|
|
| |
| BRACKET | BOTTOM |
|
| |
| 5/8” spacing. Hang cable drum over |
|
| ||
|
|
|
| ||
| flagangle. |
| SECTION |
|
|
|
|
|
|
| |
| Repeat for the right hand side. |
|
|
|
|
|
|
|
| Lag | |
|
|
|
| screw |
Please Do Not Return This Product To The Store. Contact your local