5 | Installing Q.I. Jamb Brackets |
|
|
|
|
| |||
|
|
|
|
|
| ||||
Tools Needed: | NOTE: If you have fully adjustable jamb |
|
|
|
|
| |||
Tape Measure | brackets, skip this step and complete Step |
|
|
|
|
| |||
6. |
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
| |
| Measure the length of the vertical tracks. |
|
|
|
|
| |||
| Using the jamb bracket schedule, determine |
|
|
|
|
| |||
| the placement of the jamb brackets for your |
|
|
|
|
| |||
| door height and track type. |
|
|
|
|
|
|
| |
| To install the jamb brackets, align the |
|
|
|
|
| |||
| twistlock tab on the quick install jamb |
| Left side shown |
| Right side shown | ||||
| bracket with the quick install feature in the | Twistlock |
| Top |
| ||||
| track and turn the bracket perpendicular to |
| 3rd SET HOLES | ||||||
| tab |
|
| hole | |||||
| the track so the mounting flange is toward |
|
|
|
|
| |||
| the back (flat) leg of the track. |
|
|
|
| Middle |
| ||
|
|
|
|
|
|
|
| 2nd SET HOLES | |
|
|
|
|
|
|
|
| hole | |
|
|
|
|
|
|
|
|
| |
|
|
|
|
| Q.I. jamb bracket |
|
| ||
|
| JAMB BRACKET SCHEDULE |
|
| Bottom |
| |||
|
| 1ST SET | 2ND SET | 3RD SET | hole |
| |||
| DOOR |
|
| ||||||
|
|
|
|
|
|
|
| 1st SET HOLES | |
| HEIGHT | JAMB BKT | POSITION | JAMB BKT | POSITION | JAMB BKT | POSITION |
| |
|
| Quick install feature | |||||||
| 6’ 6” and 7’ 0” |
|
|
|
|
|
| ||
| QIJB - 3 | MIDDLE | QIJB - 5 | Bottom | NOT APPLICABLE |
|
| ||
| 3 (Section High Doors) |
|
| ||||||
|
|
|
|
|
|
|
|
| |
| 8’ 0” | QIJB - 3 | MIDDLE | QIJB - 6 | TOP | QIJB - 7 | MIDDLE |
|
|
| 4 (Section High Doors) |
|
| ||||||
|
|
|
|
|
|
|
|
|
6 |
| Left Hand |
|
|
|
| |
| Drums | TORQUEMASTER® |
|
| counterbalance |
| |
|
|
| |
|
| DRUM |
|
Tools Needed: | IMPORTANT: Right and left hand is |
|
|
None | always determined from inside the |
| #1 End Hinge |
| building looking out. |
| (hinge tube) |
| NOTE: For door section identification see |
|
|
| page 4. |
| BOTTOM |
|
| Counterbalance | SECTION |
| TorqueMaster® counterbalance drums | cable | Rollers |
| are marked right and left hand. Uncoil the | BOTTOM |
|
| counterbalance cables and make sure you |
| |
| place the right hand cable loop on the right | SECTION |
|
|
|
| |
| hand milford pin and place the left hand |
|
|
| cable loop on the left hand milford pin. |
|
|
| Insert a roller into bottom bracket of the |
| Bottom bracket |
| bottom section and insert another roller | MILFORD PIN | |
|
| ||
| at #1 end hinge at the top of the bottom |
| BOTTOM |
| section. Repeat for other side. |
| |
|
| SECTION | |
|
|
| |
| NOTE: Verify astragal (bottom seal) is |
|
|
| aligned with door section. If there is more |
|
|
| than 1/2” excess astragal on either side, |
| Astragal |
| trim astragal even with door section. |
|
|
14Please Do Not Return This Product To The Store. Contact your local
yellow pages business listings or go to the Find a Dealer section online at