5

Installing Q.I. Jamb Brackets

 

 

 

 

 

 

 

 

 

 

 

Tools Needed:

NOTE: If you have fully adjustable jamb

 

 

 

 

 

Tape Measure

brackets, skip this step and complete Step

 

 

 

 

 

6.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Measure the length of the vertical tracks.

 

 

 

 

 

 

Using the jamb bracket schedule, determine

 

 

 

 

 

 

the placement of the jamb brackets for your

 

 

 

 

 

 

door height and track type.

 

 

 

 

 

 

 

 

To install the jamb brackets, align the

 

 

 

 

 

 

twistlock tab on the quick install jamb

 

Left side shown

 

Right side shown

 

bracket with the quick install feature in the

Twistlock

 

Top

 

 

track and turn the bracket perpendicular to

 

3rd SET HOLES

 

tab

 

 

hole

 

the track so the mounting flange is toward

 

 

 

 

 

 

the back (flat) leg of the track.

 

 

 

 

Middle

 

 

 

 

 

 

 

 

 

2nd SET HOLES

 

 

 

 

 

 

 

 

hole

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Q.I. jamb bracket

 

 

 

 

JAMB BRACKET SCHEDULE

 

 

Bottom

 

 

 

1ST SET

2ND SET

3RD SET

hole

 

 

DOOR

 

 

 

 

 

 

 

 

 

 

1st SET HOLES

 

HEIGHT

JAMB BKT

POSITION

JAMB BKT

POSITION

JAMB BKT

POSITION

 

 

 

Quick install feature

 

6’ 6” and 7’ 0”

 

 

 

 

 

 

 

QIJB - 3

MIDDLE

QIJB - 5

Bottom

NOT APPLICABLE

 

 

 

3 (Section High Doors)

 

 

 

 

 

 

 

 

 

 

 

 

8’ 0”

QIJB - 3

MIDDLE

QIJB - 6

TOP

QIJB - 7

MIDDLE

 

 

 

4 (Section High Doors)

 

 

 

 

 

 

 

 

 

 

 

6

 

Left Hand

 

 

 

 

 

Drums

TORQUEMASTER®

 

 

counterbalance

 

 

 

 

 

 

DRUM

 

Tools Needed:

IMPORTANT: Right and left hand is

 

 

None

always determined from inside the

 

#1 End Hinge

 

building looking out.

 

(hinge tube)

 

NOTE: For door section identification see

 

 

 

page 4.

 

BOTTOM

 

 

Counterbalance

SECTION

 

TorqueMaster® counterbalance drums

cable

Rollers

 

are marked right and left hand. Uncoil the

BOTTOM

 

 

counterbalance cables and make sure you

 

 

place the right hand cable loop on the right

SECTION

 

 

 

 

 

hand milford pin and place the left hand

 

 

 

cable loop on the left hand milford pin.

 

 

 

Insert a roller into bottom bracket of the

 

Bottom bracket

 

bottom section and insert another roller

MILFORD PIN

 

 

 

at #1 end hinge at the top of the bottom

 

BOTTOM

 

section. Repeat for other side.

 

 

 

SECTION

 

 

 

 

NOTE: Verify astragal (bottom seal) is

 

 

 

aligned with door section. If there is more

 

 

 

than 1/2” excess astragal on either side,

 

Astragal

 

trim astragal even with door section.

 

 

14Please Do Not Return This Product To The Store. Contact your local Wayne-Dalton dealer. To find your local Wayne-Dalton dealer, refer to your local

yellow pages business listings or go to the Find a Dealer section online at www.Wayne-Dalton.com

Page 14
Image 14
Wayne-Dalton 341458 installation instructions Installing Q.I. Jamb Brackets, Drums