Setup and Installation
2.0Scope
Setup and Installation guides the user through tools and equipment required for connecting the EX 5/7/11RT and battery installation or replacement. Included are assembly instructions, power cable connections with wire diagrams for configuring the product to hardware specifications.
2.1Unpacking and Parts Check
Once the EX 5/7/11RT systems has been inspected and received from the shipping courier, the unit should be moved to a position as close to the final installation location as possible. See Figures
All Modules are shipped in separate boxes.
Prior to any installation, the following items should be observed upon receipt of the EX 5/7/11RT.
1.Inspect shipment for any damage prior to receipt. Damage claims should be filed directly with the courier. Replacements for damaged components should be ordered through MGE Customer Support Services at
2.Remove wrapping and foam corners to verify that the equipment nameplate (located on the rear of the units) details a system that corresponds with the equipment ordered.
Installation | 2 — 1 |