MGE UPS Systems EX-5, EX-7, EX-11RT manual AC Input, Connection of Optional CLA Module

Page 45

Installation and User Manual

2.9Connection of Optional CLA Module

1. Connect the battery power cable 40 and battery detection cable 42 (provided with the CLA Module) between the Power Module and the CLA Module.

2.Connect the DC Input of the CLA Module to high power battery cabinet.

DC Input Cable cross-section (not provided): maximum 4 AWG solid or stranded wire.

3.Connect the utility AC input to terminal blocks L1 and L2 of the CLA.

AC input cable cross-section (not provided): maximum 16 AWG solid or stranded wires. Field wiring connections to terminal block shall be made using the following:

– No. 14 AWG, 60º C copper wires for AC inputs.

– No. 10 AWG, 75º C copper wires for DC inputs.

Figure 2-17: Rear view of CLA Module cable battery and AC input connections

Connection Diagram

(inside CLA Module)

- +

DC INPUT

240Vdc

NL

(L2) (L1)

AC INPUT

156-280Vac

42

40

Terminal tightening torque:

– 5 lb-in. for AC input terminals

– 18 lb-in. for DC input terminals

DC Input to High Power Battery Cabinet

Separate, 15A Utility AC Source @ 208 or 240

Use 15A DBL. Pole CB

86-86000-00 B00

Installation

2 — 19

Image 45
Contents EX 5/7/11RT Systems Page Technical Support Customer Care Center Hours 24/7 MGE UPS SYSTEMS, INC Scenic Avenue Costa Mesa, CA 92626 714EX 5/7/11RT Systems Contents Setup and Installation Return Policy for Repair of Single Phase Products RGA Technical Support and Product ServicesFigures Tables Certification Standards Important Safety InstructionsEnvironment Special PrecautionsAdditional Modules Serial Numbers Section Descriptions This page left blank intentionally Input voltage must be the same as output voltage on HV units ScopePart Number Description Transformer Module Characteristics Ratings System Electrical CharacteristicsTower Configuration Standard ConfigurationRack Configuration Model Dimensions HxWxD WeightsRear Panel Components Power Module EX 5/7/11 RTPower Module Display and Control Panel EX RT Transformer Module1 1 R T Optional Accessories Power Module Rail KitBattery/Transformer/CLA Module Rail Kit Battery Extension Cable Kit Multiple Battery Module Backup Time at Full LoadInput/Output Box Battery Integration Kit with CastersEX RT Transformer Module Contents CLA Module Contents EX 5/7/11RTRecommended Batteries All Modules are shipped in separate boxes Unpacking and Parts CheckContents of Standard EX 5/7/11RT Systems Contents of EXB 5/7/11RT Battery Module PN 86207 /86209 Installation in Tower Configuration Installation in Rack Mounting Configuration Not to scale Page Bracket System Install input/output cables Per .7 prior to this stepCommunication Ports Connecting the RS232 Communication PortInstallation of Optional Transverse Card Connecting the Dry Relay Contact Communication PortJBus Card Dual U-Talk/Basic CardProper operation Dual port Shut CardRemote Emergency Power Off Repo Communication Port System Connections Max AWG EX 11RTSources are open OFF/OPEN Output Always connect the earth ground wire firstConnecting EX RT Transformer Module Protection for all transformer output terminals120VAC output terminals Lb-N, La-N Bypass AC Mains Power Module I/O Box Connection of Battery Module EXB Connection of Optional CLA Module AC InputThis page left blank intentionally Required for initial startup only Initial StartupControl Panel with scroll up and down buttons UPS PersonalizationDisplay Factory setting Options Comments Display Factory setting OptionsMGE UPS SYSTEMS, INC Symptoms IT Network mode Industrial mode UPS personalization through external software Then go to Advanced settings and UPS settingsFinal Startup sequence During the startup, if the Bypass AC source is outOperating Modes Normal double conversion ModeECO mode display ECO ModeTransfer to Battery Power Operation on Battery PowerFirst Case Operation on battery Second Case Low battery warningPower to the load Return of Normal AC sourceShutdown Symptoms Indication Correction TroubleshootingBattery Fault LED 1CXXXXXXX Hot Swapping the Power ModuleRe-connecting the Power Module Hot Swapping the Battery Module Disconnecting the Battery ModuleRe-connecting the Battery Module This page left blank intentionally System Input/Output Power Ratings Electrical SpecificationsSystem Overload Characteristics Source Voltage FrequencySystem Backup Characteristics System Short Circuit ProtectionEX RT CLA Module KVA / kW 25% 50% 75% 100% Output load percentage Configuration for Hours backup timeOperation Mode On-line On Battery Environmental CharacteristicsHeat Rejection SystemProprietary Rights Statement MGE Standard Single Phrase WarrantyWarranty Extension Warranty+ not available on products User InformationProduct information Part Number Assembly Number Serial number Scheduling Field Service Engineer SupportEX 5/7/11RT Systems Glossary IEC Osha This page left blank intentionally Reorder Form Scenic Avenue Costa Mesa, CA Contact MGE