Sterling 682.88107.00 Maintenance Schedule, Photocopy this page for your maintenance records

Page 30

Chapter 5: Maintenance

5-1 Maintenance Schedule

The checklist below contains a list of items which should be inspected and/or replaced to keep your Portable Hot Oil TCU operating at peak efficiency. Perform each inspection at the regular intervals listed below.

System model #

 

 

 

 

 

 

 

 

 

 

 

 

Serial #

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Every week

Date/

Date/

 

Date/

 

Date/

 

Date/

 

 

Date/

Date/

Date/

Date/

 

Date/

 

Date/

 

Date/

Date/

By

By

 

By

 

 

By

 

 

By

 

 

By

By

By

 

By

 

By

 

By

 

By

By

Check fluid level.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

add fluid as needed

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Check connecting

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

lines, hoses, &

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

conectors for wear

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

or damage.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Every month

Jan

Feb

 

Mar

 

Apr

 

May

Jun

Jul

 

Aug

 

Sep

 

Oct

 

Nov

 

Dec

Check for leaks at

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

pump seal,

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

gaskets, etc.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Check pump drive

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

V belt for wear.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Check reservoir

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

tank vent for

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

obstructions.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Every Quarter

 

Next scheduled

 

Actual inspection

Next scheduled

 

Actual inspection

 

 

 

inspection

 

 

 

 

 

 

Date/By

 

 

 

 

inspection

 

 

Date/By

 

Check the heat transfer

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

fluid for deterioration.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Do a routine check of the

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

fluid every 1,000 hours of

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

operation or every three (3)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

months, whichever comes

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

first. Contact the Service

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Department for information

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

on fluid testing

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Every Six Months

Next scheduled

 

Actual inspection

Next scheduled

 

Actual inspection

 

 

 

inspection

 

 

 

Date/By

 

 

 

 

inspection

 

 

Date/By

 

Inspect electrical

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

connections for secure, tight

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

terminations and ground

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

connections. Inspect the

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

power cable at the entrance

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

point to the electrical

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

enclosure.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Check the mounting bolts on

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

the pump, the motor, and

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

the heater flange for

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

tightness

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Remove the heat exchanger

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

tube bundle and check it for

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

lime and mineral deposits.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Carefully clean the bundle

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

as needed.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

- Photocopy this page for your maintenance records -

 

 

 

 

 

 

Upright Portable Hot Oil TCUs

 

 

 

 

Chapter 5: Maintenance

 

 

 

 

 

 

 

 

 

 

30

 

 

Image 30
Contents Upright Hot Oil Temperature Control Units Shipping Info Table of Contents Troubleshooting Safety How to Use This ManualSafety Symbols Used in this Manual Wear Safety Glasses and Work Gloves Responsibility General ResponsibilityOperator Responsibility RememberMaintenance Responsibility Reporting a Safety DefectFunctional Description Standard FeaturesMechanical Features Models Covered in This ManualElectrical Features Controller FeaturesOptions Heater Tank Feature DescriptionsImmersion Heaters PumpConnection Lines Electrical System ControlsElectrical Panel and System Components Air Purge Pressure SwitchSafety Thermostat Reservoir TankSafety Devices and Interlocks Safety Circuit StandardsCooling Optional Safety Device Lock-Outs Fail Safe OperationUncrating the Equipment InstallationInstallation Location Considerations Rigging and Placing the TCUElectrical Connections Setup Procedures Connecting PipingPiping Considerations for Mobile Installations Connecting Process Piping Connecting Cooling Water PipingConnecting Vent Piping Upright Unit Piping Setup Initial Start-up Starting the Hot Oil TCUPage Operation Start-upController Description & Operation Identifying Control Panel Switches Control Panel SwitchesIdentifying System Status Board Indicators System Status Board IndicatorsStatus Indicator Lights Mode Indicator LightsFault Indicator Lights Returning Fluid to the Tank Shutting Down the Hot Oil TCUPage Maintenance Maintenance SchedulePhotocopy this page for your maintenance records Routine Servicing Preventative MaintenancePreventative Pump Maintenance Draining the Unit for StorageCleaning the Pump Corrective MaintenanceAdjusting End Clearance Examining Internal PartsMaintaining the Pump Disassembling the PumpPump Assembly Thrust Bearing Adjustment Installation of Carbon Graphite BushingsTroubleshooting Problem Possible cause Corrective actionIntroduction OFF Problem Possible cause Corrective action Appendix Optional ComponentsTechnical Specifications Annex B InformationUpright Portable Hot Oil TCUs Appendix Drawings and Diagrams 18-24 GPM Pump ConstructionThrust Bearing Assembly Belt Tensioning Instructions Heater Gasket Part number Description 542-00007-08 Spare Parts ListImmersion Heaters Part number Description Pilot Lights Part number DescriptionControllers Part number Description Selector Switches and Push ButtonsPressure Switches Part number DescriptionSensing Probe Equipment Disconnect SwitchesSolenoid Valves Part number Description Heater Tank InsulationTCU Safety Tags Safety Tag InformationWarranty Returns Returned Material PolicyTCU Identification Serial Number Tag Technical Assistance