Sterling 682.88107.00 specifications Appendix, Optional Components

Page 39

Chapter 7: Appendix

7-1 Optional Components

The following is a list of options which your portable hot oil tcu may have been equipped with:

Drain valve

Hour meter; measures total pump run time hours

General fault visual alarm

Autovent sequence; deducts available

Low level alarm; deducts available

High level indicator light

Manual bypass; deducts available

M2B+ microprocessor controller options include:

4-20 mA remote set point and retransmission

SPI protocol, RS-485

General protocols, types RS-232, -485

Remote sensor; 10 Ft. (3m)

Heat exchanger options of 3.9 sq. ft. (0.3627 sq. m) and 6.7 sq. ft. (0.6231 sq. m)

Remote controller

Lexan cover

Optional operating voltages of 208/3/60, 230/3/60, 575/3/60, 380/3/50, and 415/3/50

Upright Portable Hot Oil TCUs

Chapter 7: Appendix

39

Image 39
Contents Upright Hot Oil Temperature Control Units Shipping Info Table of Contents Troubleshooting Safety How to Use This ManualSafety Symbols Used in this Manual Wear Safety Glasses and Work Gloves General Responsibility ResponsibilityRemember Operator ResponsibilityReporting a Safety Defect Maintenance ResponsibilityModels Covered in This Manual Standard FeaturesMechanical Features Functional DescriptionElectrical Features Controller FeaturesOptions Pump Feature DescriptionsImmersion Heaters Heater TankConnection Lines Electrical System ControlsElectrical Panel and System Components Reservoir Tank Pressure SwitchSafety Thermostat Air PurgeSafety Devices and Interlocks Safety Circuit StandardsCooling Optional Fail Safe Operation Safety Device Lock-OutsRigging and Placing the TCU InstallationInstallation Location Considerations Uncrating the EquipmentElectrical Connections Setup Procedures Connecting PipingPiping Considerations for Mobile Installations Connecting Process Piping Connecting Cooling Water PipingConnecting Vent Piping Upright Unit Piping Setup Starting the Hot Oil TCU Initial Start-upPage Operation Start-upController Description & Operation Control Panel Switches Identifying Control Panel SwitchesSystem Status Board Indicators Identifying System Status Board IndicatorsStatus Indicator Lights Mode Indicator LightsFault Indicator Lights Shutting Down the Hot Oil TCU Returning Fluid to the TankPage Maintenance Maintenance SchedulePhotocopy this page for your maintenance records Draining the Unit for Storage Preventative MaintenancePreventative Pump Maintenance Routine ServicingExamining Internal Parts Corrective MaintenanceAdjusting End Clearance Cleaning the PumpDisassembling the Pump Maintaining the PumpPump Assembly Installation of Carbon Graphite Bushings Thrust Bearing AdjustmentTroubleshooting Problem Possible cause Corrective actionIntroduction OFF Problem Possible cause Corrective action Optional Components AppendixAnnex B Information Technical SpecificationsUpright Portable Hot Oil TCUs Appendix 18-24 GPM Pump Construction Drawings and DiagramsThrust Bearing Assembly Belt Tensioning Instructions Pilot Lights Part number Description Spare Parts ListImmersion Heaters Part number Description Heater Gasket Part number Description 542-00007-08Part number Description Selector Switches and Push ButtonsPressure Switches Controllers Part number DescriptionHeater Tank Insulation Disconnect SwitchesSolenoid Valves Part number Description Sensing Probe EquipmentReturned Material Policy Safety Tag InformationWarranty Returns TCU Safety TagsTechnical Assistance TCU Identification Serial Number Tag