S T E P
7
Be careful to assemble all components in the sequence they are presented.
A.Slide Bronze Washer (3) onto Multi Hip Vertical Frame (P). Slide Multi Hip Adjuster (AC) onto Multi Hip Vertical Frame (P).
B.Slide Multi Hip Arm (AD) onto Multi Hip Vertical Frame (P) attach using Pop Pin (111) and:
One 92 (3/8” x 5/8” allen bolt) One 93 (3/8” washer)
Attach two End Caps (16) to the top and bottom of Multi Hip Arm (AD) as shown.
C.Slide Bronze Washer (4) onto Multi Hip Arm (AD).
Slide Multi Hip Pad Holder (AE) onto the Multi Hip Arm (AD) and hold in place using:
One 97 (1/2” x 3/4” allen bolt) One 69 (1/2” washer)
D.Attach Round End Cap (9) into Multi Hip Pad Holder (AE). Attach End Cap (7) to the bottom of Multi Hip Pad Holder (AE).
E.Slide 3” Nylon Washer (21) and Roller (30) onto Multi Hip Pad Holder (AE) as shown. Slide 3” Nylon Washer (21) onto Multi Hip Pad Holder (AE) and hold in place with Roller End Cap (10).
Note:
You should now wrench tighten all bolts and nuts in this step.
mm
Inch
22