S T E P
13
Be careful to assemble all components in the sequence they are presented.
Low Pulley Cable (38)
Small Ball End | Small Ball End |
6120 mm | 20’ 9” |
|
|
Short Cable (39)
Stamped Eye End | Stamped Eye End |
757 mm | 2’ 5” |
|
|
A.See Diagram 1. Route Leg Extension Cable (38) up to the Top Main Frame (E).
Install Pulley (B5) under Cable (38) and into the pulley flange on Top Main Frame (E) as shown in Diagram 2 using:
One 51 (3/8” x 1 3/4” hex head bolt) Two 70 (3/8” washer)
One 67 (3/8” nylon lock nut)
B.See Diagram 1. Route Cable (38) down and under
Route Cable (38) under
C.Route Cable (38) through the bottom of the Leg Extension Arm (L) and hold Cable (38) in place by installing Pulley (B8) as shown in Diagram 2 using:
One 53 (3/8” x 2 1/2” hex head bolt) Two 5 (pulley spacer)
One 67 (3/8” nylon lock nut)
D.See Short Cable Diagram. Attach Short Cable (39) to Main Base Frame (A) using:
One 55 (3/8” x 3” hex head bolt) Two 70 (3/8” washer)
One 67 (3/8” nylon lock nut)
E.Route Cable (39) up to the front Pulley Holder (CB), the Pulley Holder (CB) that holds pulley (B2). Attach the Flat Eye End of Cable (39) to the hook on the bottom of this Pulley Holder (CB) as shown in Short Cable Diagram.
NOTE:
Leave all hardware finger tight. Do not wrench tighten hardware until after the final cable adjustments are complete in Step 15.
mm
Inch
34