Diagram 1
Cable Installation
High
Pulley
Cable
Start here at Double Pulley Holder (CA) by routing the cable here.
S T E P
11
! WARNING !
Selector Rod Top Bolt (98) must be threaded a minumum of 1/2” into the Selector Rod (33), and Jam Nut (102) tightened securely against spring lock washer (101) to ensure proper connection. Check the Jam Nut (102) once a week to make sure it is tight.
Diagram 1A
Cable Installation
Diagram 2
Pulley Installation
31