Weider WESY37530 Locate the Short Cable 62. Attach the eyelet, Do not tighten the Locknut yet

Page 14

26. Route the High Cable (61) up through the Right

26

 

 

Top Frame (10) and over a 90mm Pulley (38).

61

 

 

 

Attach the Pulley inside the Top Frame with an

74

 

38

M10 x 78mm Bolt (86), two M10 Washers (74),

 

 

two 17mm Spacers (58), and an M10 Nylon

 

 

 

Locknut (75).

86

 

 

 

58

 

74

 

 

 

 

10

 

 

 

 

 

58

 

 

 

75

27. Route the High Cable (61) over a 90mm Pulley

27

 

 

(38) and down through the Right Top Frame (10).

 

 

38

 

 

Attach the Pulley inside the Top Frame with an

74

10

 

M10 x 78mm Bolt (86), two M10 Washers (74),

 

75

 

 

two 17mm Spacers (58), and an M10 Nylon

 

 

58

74

 

Locknut (75).

 

 

 

58

 

 

61

86

 

 

 

 

28. Locate the Short Cable (62). Attach the eyelet

28

 

 

on the Cable to the bracket on the bottom of the

54

 

10

36

Right Top Frame (10) with an M8 x 20mm

 

 

Shoulder Bolt (36), and an M8 Nylon Locknut

Bracket

 

 

(54). Do not tighten the Locknut yet.

 

62

 

 

29. Wrap the Short Cable (62) under a 90mm Pulley

29

 

 

(38). Attach the Pulley and a Cable Trap (37) to

 

 

 

 

 

the first set of holes from the top of the other

 

 

 

Double “U”-bracket (41) with an M10 x 48mm Bolt

 

 

 

(23) and an M10 Nylon Locknut (75). Make sure

62

 

 

the Cable Trap is turned to hold the Cable in

37

 

38

 

the groove of the Pulley.

 

 

 

 

 

 

 

23

75

 

 

 

 

 

41

 

 

30. Route the Short Cable (62) over a 90mm Pulley

30

 

 

(38). Attach the Pulley to the rear bracket on the

 

 

10

 

Rear

Right Top Frame (10) with an M10 x 45mm Bolt

 

 

Bracket

(78) and an M10 Nylon Locknut (75).

 

 

 

 

78

 

75

 

 

38

 

62

 

 

14

Image 14
Contents Customer HOT Line QUESTIONS?Model No. WESY37530 Serial No Table of Contents Important Precautions Left Side Before YOU BeginRight Side Assembly Make Assembly Easier for YourselfFrame Assembly Tighten the Locknuts yetPage Do not tighten the Locknuts yet Pin not shown are on the indicated side Guides 9. Make sure the slots for the WeightOn the bottom of the Weights Locknuts yet Tighten the M10 Nylon Locknuts 75 used in stepsArm Assembly Open the part bag labeled ARM AssemblyRings are toward the Cap, as shown EasilyOuter Cap 47. Make sure the teeth on Cap onto the axle. Repeat with the Right Fly PivotCable is over the welded bar inside Cable Trap is turned to hold the Cable Groove of the PulleyLocate the Short Cable 62. Attach the eyelet Do not tighten the Locknut yetPage Page Page Page Cable Trap is turned to hold the Cable Place Remove the M10 Nylon Locknut 75 used Step Locate and open the parts bag labeled Seat Assembly Remove the M10 Nylon Locknut 75 used in stepPage Adjusting the Curl PAD AdjustmentsAdjusting the Backrests Store the Curl Pad out of the way of the weight systemChanging the Weight Setting Lbs Weight Resistance ChartWeight High Press LEG Butter LOW Pulley ARM FLY ARM Lever Troubleshooting Tightening the CablesShort Cable Cable DiagramsHigh Cable Low Cable Exercise Guidelines Staying Motivated Muscle ChartCooling Down Aerobic Exercise Exercise Weight Sets RepsDate Thursday Aerobic Exercise DatePart Identification CHART- Model No. WESY37530 R1003APage Page Part LIST-Model No. WESY37530 Qty DescriptionWESY37530 Icon Health & FITNESS, INC., 1500 S W., LOGAN, UT Ordering Replacement PartsLimited Warranty