CONTRACTURE FOOTPLATE OPTION | PROCEDURE 11 | |
|
|
|
CONTRACTURE FOOTPLATE HEIGHT ADJUSTMENT (FIGURE 8)
BILATERAL CONTRACTURE
1.Remove the mounting screw, two (2) coved washers, washer and locknut that secure the footplate bracket to the contracture support.
2.Move the footplate bracket UP/DOWN to achieve desired height.
3.Align the mounting hole in the footplate bracket with one (1) of seven (7) mounting holes on the contracture support.
4.Secure the footplate bracket to the contracture support with the mounting screw, two (2) coved washers, washer and locknut. Securely tighten.
5.If necessary, repeat STEPS
CONTRACTURE PLATFORM
1.Loosen, but do not remove the two (2) hex screws and locknuts that secure the contrac- ture platform to the upper support.
2.Slide the contracture platform to the desired height.
3.Tighten the two (2) hex screws and locknuts that secure the contracture platform to the upper support.
CONTRACTURE FOOTPLATE OPTION
BILATERAL CONTRACTURE
CONTRACTURE PLATFORM
Mounting
Holes
Lock Nut
Washers
Contracture Support
Mounting Screws
Coved
Washers
Footplate
Bracket
Upper Support
Locknuts
Hex Screws
Contracture
Platform
FIGURE 8 - CONTRACTURE FOOTPLATE HEIGHT ADJUSTMENT
Part No. 1080556 Rev. I | 69 | Solara™ |