2-5. Installing Work Clamp
4
5
1 Work Cable
2 Boot
Slide boot onto work cable. Route cable out front panel opening from inside.
3 Negative
Connect cable to terminal and cover connection with boot.
4 Hardware
5 Work Clamp
Route cable through clamp handle
| 1 | and secure as shown. |
2 |
| |
| Close door. | |
|
|
Tools Needed:
3
1/2, 3/4 in
2-6. Installing Gas Supply
Tools Needed:
5/8,
|
| Obtain gas cylinder and chain to | ||||
| 1 | running gear, wall, or other station- | ||||
| ary support so cylinder cannot fall | |||||
|
| and break off valve. |
|
| ||
|
| 1 | Cap |
|
| |
| 2 | 2 | Cylinder Valve |
|
| |
| Remove cap, stand to side of valve, | |||||
|
| |||||
|
| and open valve slightly. Gas flow | ||||
|
| blows dust and dirt from valve. | ||||
|
| Close valve. |
|
| ||
| 3 | 3 | Cylinder |
|
| |
|
| 4 | Regulator/Flowmeter |
| ||
4 |
| Install so face is vertical. |
| |||
| 5 | Regulator/Flowmeter Gas |
| |||
|
|
| ||||
| Argon Gas |
| Hose Connection |
| ||
| 6 | Welding Power Source Gas | ||||
|
| |||||
|
|
| Hose Connection |
| ||
|
| Connect customer | supplied | gas | ||
OR |
| hose between regulator/flowmeter | ||||
1 | gas hose connection, and fitting on | |||||
| ||||||
| rear of welding power source. |
| ||||
|
|
| ||||
7 |
| 7 | Flow Adjust |
|
| |
5 |
| Typical flow rate is 20 cfh (cubic feet | ||||
|
| |||||
| 2 | per hour). Check wire manufactur- | ||||
|
| er’s recommended flow rate. |
| |||
|
| 8 | CO2 Adapter (Customer Sup- | |||
|
|
| plied) |
|
| |
| 3 | 9 | ||||
8 | 9 | Install adapter with | ||||
regulator/flowmeter | and | CO2 | ||||
|
| |||||
6 | CO2 Gas | cylinder. |
|
| ||
|
|
|
|