INSTALLATION
Plumbing Requirements
Plumbing Schematics–Flow 20 to 70-GPM
(continued)
HEAT PUMP WITH GAS HEATER BACK UP | MULTIPLE HEAT PUMP INSTALLATION | |
MINIUM SPACING | ||
|
Water IN & OUT Connections- Typical
(exact location varies by model)For proper operation and maximum efficiency, piping coming from the pump and filter MUST be con- nected to the "IN" port of the heater. Likewise, connect piping returning to the pool/spa to the "OUT" port of the heater. See drawing below.
PLUMBING CONNECTION DETAILFrom Pump/Filter
Return to Pool/Spa
43