Napoleon Fireplaces BGD36CFNTR, BGD36CFGN manual BGD42CF Minimum Mantel and Enclosure Clearances

Page 29

29

BGD42CF MINIMUM MANTEL AND ENCLOSURE CLEARANCES

Combustible mantel clearance can vary according to the mantel depth. Figure 92. Use the graph to help evaluate the clearance needed. These same requirements apply to any combustibles protruding on either side of the fi replace.

FIGURE 92a

FIGURE 92d

The fi replace requires a minimum enclosure height of 49“. For temperature requirements, the enclosure space around and above the fi replace must be left unobstructed.

* See Venting Section

FIGURE 92b

FIGURE 92c

This fi replace requires a minimum of 6 1/2" of cement board or non-combustible equivalent above the top of the fi replace.

W415-0661 / C / 02.20.08

Image 29
Contents Installation Operating Instructions Table of Contents W415-0661 / C General Information General InstructionsCare of Glass and Plated Parts For example in Massachusetts StateInstallation Overview Unit Dimensions38 1/2 24 1/4Venting Lengths VentingW415-0661 / C See Venting Section Typical Minimum and Maximum Vent LengthsTOP Exit Installation Rear Exit Installation Special Vent InstallationsPeriscope Termination Corner TerminationHorizontal Termination Vertical Termination Venting Application Flow ChartFireplace Vent Exit Rear Exit TOP Exit BGD36CFG TOP Exit / Horizontal Termination When HT VTDefinitions Elbow Vent Length ValuesFormula 2 HT + VT 24.75 feet ExampleFormula 1 HT 3.5VT Formula 2 HT + VT 24.75 feet Example BGD36CFG Rear Exit / Horizontal TerminationFormula 1 HT VT Formula 2 HT + VT 40 feet Formula 1 HT 3VT Formula 2 HT + VT 40 feet Example Formula 2 HT + VT 40 feet Example =5 ftBGD36CFG TOP or Rear Exit Vertical Termination BGD42CF Horizontal Termination = .03 45 + 90 + 90 +90 135 = 5.4 ft BGD42CF Vertical Termination= HR + HO = 5.5 + 5.4 = 10.9 ft HT + VTFormula 1 HT 3VT Formula 2 HT + VT 40 feet Example Installation Wall and Ceiling Protection BGD36CFG PRE-INSTALLATION PreparationBGD42CF only Adjustable Firestop Installation Vertical InstallationSpace around the pipe. Nail Headers between the joist forHorizontal AIR Terminal Installation Using Flexible Vent ComponentsExtended Horizontal and Corner AIR Terminal Installation Using Rigid Vent ComponentsVertical Venting Installation Mobile Home Installation GAS InstallationOptional Wall Switch Installation Excluding BGD36CFG Restricting Vertical VentsCavity Installing StandoffsFraming 46 1/2 BGD36CFG BGD42CFBGD36CFG Minimum Mantel and Enclosure Clearances Convex Concave Clean Face Surround Minimum Enclosure ClearancesFinished Floor Installation 37 3 Hearth InstallationOptional Clean Face Trim KIT Installation BGD42CF Minimum Mantel and Enclosure Clearances Door Installation / Removal LOG PlacementGLASS/DOOR Replacement Finishing BGD36CF FinishingGrate Door Trim LOG PlacementGrate Installation BGD36CFG Finishing BGD42CF Accessing the Blower Optional Blower InstallationInstalling the Blower BGD36CFG Accessing the Blower FigureElectrical Code in the United States GD36 Thermostatic Sensor ControlGauge Feet BGD36CFG Burner Switch / Wiring DiagramBGD36CFG Light Switch / Wiring Diagram Receptacle Wiring Diagram To Turn OFF GAS Operation BGD36CF & BGD42CFLighting Instructions For Your Safety Read Before Operating MaintenanceOperation BGD36CFG Operating InstructionsVenturi Adjustment AdjustmentsBGD36CFG Venturi Adjustment Pilot Burner Adjustment Excluding BGD36CFGBGD36CF Flame Characteristics Flame AdjustmentBGD42CF Flame Characteristics BGD36CFG Flame CharacteristicsBGD36CFG Replacements Common ReplacementsBGD42CF Replacements W415-0661 / C Symptom Problem Test Solution BGD36CFG Trouble Shooting GuideRight order Pilot lights Wiring / ConnectionNot turn on Module or Valve Ing, touch black lead to ground valve bodyAn interlock device Gas valve hasWhich will not allow Pilot burner to be Lit until the thermoModel BGD42CF only