Carrier 58HDV installation instructions Required Notice for Massachusetts Installations

Page 2

58HDV

Required Notice for Massachusetts Installations

IMPORTANT

The Commonwealth of Massachusetts requires compliance with regulation 248 CMR as follows: 5.08: Modifications to NFPA-54, Chapter 10

2)Revise 10.8.3 by adding the following additional requirements:

a.For all side wall horizontally vented gas fueled equipment installed in every dwelling, building or structure used in whole or in part for residential purposes, including those owned or operated by the Commonwealth and where the side wall exhaust vent termination is less than seven (7) feet above finished grade in the area of the venting, including but not limited to decks and porches, the following requirements shall be satisfied:

1.INSTALLATION OF CARBON MONOXIDE DETECTORS. At the time of installation of the side wall horizontal vented gas fueled equipment, the installing plumber or gasfitter shall observe that a hard wired carbon monoxide detector with an alarm and battery back-up is installed on the floor level where the gas equipment is to be installed. In addition, the installing plumber or gasfitter shall observe that a battery operated or hard wired carbon monoxide detector with an alarm is installed on each additional level of the dwelling, building or structure served by the side wall horizontal vented gas fueled equipment. It shall be the responsibility of the property owner to secure the services of qualified licensed professionals for the installation of hard wired carbon monoxide detectors

a.In the event that the side wall horizontally vented gas fueled equipment is installed in a crawl space or an attic, the hard wired carbon monoxide detector with alarm and battery back-up may be installed on the next adjacent floor level.

b.In the event that the requirements of this subdivision can not be met at the time of completion of installation, the owner shall have a period of thirty (30) days to comply with the above requirements; provided, however, that during said thirty (30) day period, a battery operated carbon monoxide detector with an alarm shall be installed.

2.APPROVED CARBON MONOXIDE DETECTORS. Each carbon monoxide detector as required in accordance with the above provisions shall comply with NFPA 720 and be ANSI/UL 2034 listed and IAS certified.

3.SIGNAGE. A metal or plastic identification plate shall be permanently mounted to the exterior of the building at a minimum height of eight (8) feet above grade directly in line with the exhaust vent terminal for the horizontally vented gas fueled heating appliance or equipment. The sign shall read, in print size no less than one-half (1/2) inch in size, ”GAS VENT DIRECTLY BELOW. KEEP CLEAR OF ALL OBSTRUCTIONS”.

4.INSPECTION. The state or local gas inspector of the side wall horizontally vented gas fueled equipment shall not approve the installation unless, upon inspection, the inspector observes carbon monoxide detectors and signage installed in accordance with the provisions of 248 CMR 5.08(2)(a)1 through 4.

5.EXEMPTIONS: The following equipment is exempt from 248 CMR 5.08(2)(a)1 through 4:

(1.) The equipment listed in Chapter 10 entitled ”Equipment Not Required To Be Vented” in the most current edition of NFPA 54 as adopted by the Board; and

(2.) Product Approved side wall horizontally vented gas fueled equipment installed in a room or structure separate from the dwelling, building or structure used in whole or in part for residential purposes.

c.MANUFACTURER REQUIREMENTS - GAS EQUIPMENT VENTING SYSTEM PROVIDED. When the manufacturer of Product Approved side wall horizontally vented gas equipment provides a venting system design or venting system components with the equipment, the instructions provided by the manufacturer for installation of the equipment and the venting system shall include:

1.Detailed instructions for the installation of the venting system design or the venting system components; and

2.A complete parts list for the venting system design or venting system.

d.MANUFACTURER REQUIREMENTS - GAS EQUIPMENT VENTING SYSTEM NOT PROVIDED. When the manufacturer of a Product Approved side wall horizontally vented gas fueled equipment does not provide the parts for venting the flue gases, but identifies “special venting systems”, the following requirements shall be satisfied by the manufacturer:

1.The referenced “special venting system” instructions shall be included with the appliance or equipment installation instructions; and

2.The “special venting systems” shall be Product Approved by the Board, and the instructions for that system shall include a parts list and detailed installation instructions.

e.A copy of all installation instructions for all Product Approved side wall horizontally vented gas fueled equipment, all venting instructions, all parts lists for venting instructions, and/or all venting design instructions shall remain with the appliance or equipment at the completion of the installation.

2

Image 2
Contents Installation Instructions Required Notice for Massachusetts Installations FIRE, EXPLOSION, and Asphyxiation Hazard Furnace Reliability HazardCUT Hazard Water Damage to Property Hazard Frozen Water Pipe HazardWinter Shutdown Location and Clearances Installation PositionsInstallation Requirements Carbon Monoxide Poisoning HazardCondensate Trap and Drain Lines Furnace Installation ConsiderationsHorizontal Furnace Installation LevelingDimensions and Clearances Outdoor Combustion Air Method Air Openings and Connecting DuctsKnock Outs Confined Space Installation RequirementsIndoor Combustion Air Unconfined Space Make the Following Check Ventilation AirVenting and Combustion Air Check Contaminated Combustion Air For Two Pipe Installation Direct VentDual Certified Direct or Non- Direct Vent Combustion Air and Vent Piping Insulation Guidelines Sizing Combustion Air and Vent PipeVent Termination Clearances Single Piping onlyDirect Vent Termination Clearance Other than Direct Vent Termination Clearance Condensate Drain Trap Frozen and Burst Water Pipe HazardUpflow Installations Top Vent See Fig OnlyUpflow Installations Vent through Left-Side See Fig Side ViewAll Models Vent through Right-Side See Fig PVCDownflow Left-Side Vent and Trap See Fig ExhaustDownflow Right-Side Vent and Trap See Fig Downflow Right-Side Vent and TrapHorizontal Left through Top See Fig ExhaustHorizontal Left-Side Vent See Fig InletHorizontal Right through Top See Fig Horizontal Right through TopHorizontal Right-Side Vent See Fig ExhaustVent Pipe Connection Connecting Vent and Combustion Air PipingCombustion Air Pipe Connection Direct Vent Horizontal Termination Connecting Vent Pipes and TerminationJoining Pipe and Fittings Vent Termination Shielding Using Exterior RisersVertical Termination Multi Vent Termination ClearancesConcentric Vent and Combustion-Air Carbon Monoxide POISONING, Fire and Explosion Hazard Concentric Vent TerminationVertical & Horizontal Termination 40,000, 50,000, 60,000, & 75,000 Btuh Furnaces Fire and Explosion Hazard Gas Piping RequirementsGas Supply Requirements Fire HazardElectrical Operation Hazard Typical Gas Piping for UpflowGeneral Derating Rules High Altitude Air Pressure SwitchPropane Conversion Additional Propane Connection RequirementsChanging Orifices for High Altitude Electrical SHOCK, Fire or Explosion HazardJunction Box J- Box Relocation Power Supply WiringFinal Gas Piping Check Thermostat HeatingFurnace Control Fuse CoolingOptional Equipment Tap Select Interface BoardSizing InstallationConnections InsulationAddition Of Air Conditioning Filter Installation using Filter RackFilters Combustible Floor Installation Subbase for Combustible FloorGas Supply Pressure Manifold Gas Pressure AdjustmentsStartup Main Burner Flame Check Temperature Rise CheckNatural Gas Input Rating Check Hard Wired Continuous Fan Operation Blower AdjustmentsContinuous- Fan using G Changing Blower SpeedOn = OFF = Continuous Circulating Fan G Request Low Cooling Y1 RequestHigh Cooling Y1 & Y/Y2 or Y/Y2 Request Furnace Control Board Diagnostic Codes See Fig Heating Request with Gas Shut OffWiring Diagram Thermostat Wiring Guide No Connection SINGLE-STAGE Thermostat TWO-STAGE Catalog No 58HDV---01SI