Carrier 58HDV installation instructions Horizontal Right-Side Vent See Fig, Exhaust

Page 26

58HDV

 

 

 

 

Plastic Cap

 

Coupling & Clamps

Single Pressure Switch Detail

 

 

 

Yellow or black

 

 

 

 

 

 

(Optional)

AIR FLOW

 

 

 

 

 

 

 

 

 

 

Vent Drain

EXHAUST

Supplied Tee

 

 

 

 

 

 

Field

 

 

 

 

& Clamps

 

 

 

 

 

 

Level or Sloped

 

 

 

 

 

 

towards Tee

 

 

 

 

 

 

 

 

Tee Trap

 

 

 

 

 

 

White PVC

 

 

 

 

 

 

(loose parts bag)

Relief Tube

 

 

 

 

Elbow Tube Black Rubber

3/

 

 

 

1/ (12.7mm) ID & Clamps

Black Rubber

 

 

 

 

2

 

(4.8mm) ID

16

 

 

(Loose Parts Bag)

 

 

 

 

 

 

 

 

 

 

 

On Some Models

 

 

 

 

 

ONLY

 

Flexible Tubing Connector

3/

 

 

 

 

 

16

 

 

 

INLET

 

(4.8mm) OD (Loose Parts Bag)

 

 

 

 

 

 

 

 

 

 

 

 

 

OFF

 

 

Relief Tube Extension

 

 

ON

 

 

 

 

 

Alternate Orientation

Black Rubber 3/ (4.8mm) ID

 

 

16

 

 

 

 

 

 

Cut to Fit (Loose Parts Bag)

 

 

 

 

 

 

Dual Pressure Switch

Remove KO before

 

 

 

 

mounting Trap

 

 

Drain Tube Black, 5/ (15.9mm) ID & Clamps

 

 

 

 

 

8

 

Drain Tube

Barbed Coupling 1/2(12.7mm)

Corrugated Cut at straight section

 

 

 

 

 

Black Rubber

OD (Loose Parts Bag)

 

 

 

 

1/ (12.7mm) ID

 

 

 

 

 

 

 

 

 

 

2

 

 

 

 

 

 

& Clamps

 

 

 

 

Leave room for clamp

Cut Here

 

 

25--24--70c

Representative drawing only, some models may vary in appearance.

A07712

Fig. 19 - Horizontal Right Side Vent

Horizontal Right-Side Vent (See Fig. 19)

Disconnect drain tee if installed

Disconnect the hoses from the trap assembly, and remove trap and trap mounting bracket from the blower compartment. Using cover plate and gasket provided in the loose parts bag, cover the hole from the burner compartment to the blower compartment and secure with screws.

Remove knockout from the side of the furnace casing where drain tube will exit.

Mount the trap externally to the bottom side of the unit using the two(2) screws provided in the location shown.

Cut the corrugated tube as shown in the illustration above. Connect the corrugated hose from the transition to the trap. Secure connections with clamps.

Connect the black 1/2(12.7mm) ID drain tube from the Vent Drain to the trap. If an extension is required, use the 1/2(12.7mm) OD barbed coupling and the black 1/2(12.7mm) ID drain tube in the loose parts bag. Cut tube to length. Secure connections with clamps.

Connect the 3/16(4.8mm) ID relief tube to the middle port on the trap. If an extension is required, use the clear 3/16(4.8mm) OD splice connector and the black 3/16(4.8mm) ID relief tube in the loose parts bag. Cut tube to length.

Cut an appropriate length of 2(50.8mm) PVC pipe, fittings and extension pipe long enough to exit the cabinet and connect the vent drain to either:

SA 2(50.8mm) PVC coupling fastened onto the drain tee Install tee trap into bottom section of tee and glue pipe.

Important: The pipe to the tee trap must be level or sloping towards the tee trap

Connect the tee trap and the main drain line exiting the casing as shown in Fig. 19.

NOTE: It is recommended that all PVC piping and fitting connections be fit up and inspected before final cementing. Both the external trap and the external tee trap must be primed before operation. Verify all condensate drain connections are securely clamped. A coupling and clamps (in loose part bag) may be installed as shown for future servicing of the vent system.

26

Image 26
Contents Installation Instructions Required Notice for Massachusetts Installations FIRE, EXPLOSION, and Asphyxiation Hazard Furnace Reliability HazardCUT Hazard Water Damage to Property Hazard Frozen Water Pipe HazardWinter Shutdown Location and Clearances Installation PositionsInstallation Requirements Carbon Monoxide Poisoning HazardCondensate Trap and Drain Lines Furnace Installation ConsiderationsHorizontal Furnace Installation LevelingDimensions and Clearances Outdoor Combustion Air Method Air Openings and Connecting DuctsKnock Outs Confined Space Installation RequirementsIndoor Combustion Air Unconfined Space Make the Following Check Ventilation AirVenting and Combustion Air Check Contaminated Combustion Air For Two Pipe Installation Direct VentDual Certified Direct or Non- Direct Vent Combustion Air and Vent Piping Insulation Guidelines Sizing Combustion Air and Vent PipeVent Termination Clearances Single Piping onlyDirect Vent Termination Clearance Other than Direct Vent Termination Clearance Condensate Drain Trap Frozen and Burst Water Pipe HazardUpflow Installations Top Vent See Fig OnlyUpflow Installations Vent through Left-Side See Fig Side ViewAll Models Vent through Right-Side See Fig PVCDownflow Left-Side Vent and Trap See Fig ExhaustDownflow Right-Side Vent and Trap See Fig Downflow Right-Side Vent and TrapHorizontal Left through Top See Fig ExhaustHorizontal Left-Side Vent See Fig InletHorizontal Right through Top See Fig Horizontal Right through TopHorizontal Right-Side Vent See Fig ExhaustVent Pipe Connection Connecting Vent and Combustion Air PipingCombustion Air Pipe Connection Direct Vent Horizontal Termination Connecting Vent Pipes and TerminationJoining Pipe and Fittings Vent Termination Shielding Using Exterior RisersVertical Termination Multi Vent Termination ClearancesConcentric Vent and Combustion-Air Carbon Monoxide POISONING, Fire and Explosion Hazard Concentric Vent TerminationVertical & Horizontal Termination 40,000, 50,000, 60,000, & 75,000 Btuh Furnaces Fire and Explosion Hazard Gas Piping RequirementsGas Supply Requirements Fire HazardElectrical Operation Hazard Typical Gas Piping for UpflowGeneral Derating Rules High Altitude Air Pressure SwitchPropane Conversion Additional Propane Connection RequirementsChanging Orifices for High Altitude Electrical SHOCK, Fire or Explosion HazardJunction Box J- Box Relocation Power Supply WiringFinal Gas Piping Check Thermostat HeatingFurnace Control Fuse CoolingOptional Equipment Tap Select Interface BoardSizing InstallationConnections InsulationAddition Of Air Conditioning Filter Installation using Filter RackFilters Combustible Floor Installation Subbase for Combustible FloorGas Supply Pressure Manifold Gas Pressure AdjustmentsStartup Main Burner Flame Check Temperature Rise CheckNatural Gas Input Rating Check Hard Wired Continuous Fan Operation Blower AdjustmentsContinuous- Fan using G Changing Blower SpeedOn = OFF = Continuous Circulating Fan G Request Low Cooling Y1 RequestHigh Cooling Y1 & Y/Y2 or Y/Y2 Request Furnace Control Board Diagnostic Codes See Fig Heating Request with Gas Shut OffWiring Diagram Thermostat Wiring Guide No Connection SINGLE-STAGE Thermostat TWO-STAGE Catalog No 58HDV---01SI