Carrier 58HDV Startup, Gas Supply Pressure, Manifold Gas Pressure Adjustments

Page 42

2

(50.8mm)

T S

Plenum

H

K R

P

L

N

Hole in

Floor

A = 4 1/4” (108mm) Minimum clearance from back of hole to wall or other obstruction.

J

2(50.8mm)

 

1(25.4mm)

M

A07784

58HDV

A

25--20--46

 

A07781

Fig. 47 - Exploded View of Subbase for Furnace Only

21/2(63.5mm)

11/2(38.1mm)

A09182

Fig. 48 - Exploded View of Base for Downflow Cased Coil

5.Position furnace or coil cabinet and furnace on subbase so it aligns between the locating tabs.

Furnace

Installation of

Combustible

Floor Base

Wood Floor

Plenum

A07783

Fig. 49 - Setting the Subbase

This subbase for combustible floors has been designed so that the height of the subbase raises the downflow coil off the floor to allow easy installation of the condensate drain. See Fig. 50

Fig. 50 - Condensate Line Raised by Base

CHECKS AND ADJUSTMENTS

NOTE: Verify the input rate of the furnace.

!WARNING

FIRE OR EXPLOSION HAZARD

Failure to follow this warning could result in personal injury, death and /or property damage.

Turn OFF gas at shut off before connecting manometer.

Startup

NOTE: Refer to the start-up procedures in the “User’s Information Manual” or to the “Operating Instructions Label” on the furnace.

!WARNING

ELECTRICAL OPERATION HAZARD

Failure to follow this warning could result in personal injury, death, and/or property damage.

If any sparks, odors or unusual noises occur, immediately shut OFF power to the furnace. Check for wiring errors or obstruction to blower.

Gas Supply Pressure

Gas supply pressure should be within minimum and maximum values listed on rating plate. Pressures are usually set by gas suppliers.

Manifold Gas Pressure Adjustments

(High and Low Heat)

NOTE: Make adjustment to manifold pressure with burners operating.

!WARNING

FIRE OR EXPLOSION HAZARD

Failure to follow this warning could result in personal injury, death and /or property damage.

Turn OFF gas at shut off before connecting manometer.

42

Image 42
Contents Installation Instructions Required Notice for Massachusetts Installations Furnace Reliability Hazard CUT HazardFIRE, EXPLOSION, and Asphyxiation Hazard Frozen Water Pipe Hazard Winter ShutdownWater Damage to Property Hazard Location and Clearances Installation PositionsInstallation Requirements Carbon Monoxide Poisoning HazardCondensate Trap and Drain Lines Furnace Installation ConsiderationsHorizontal Furnace Installation LevelingDimensions and Clearances Air Openings and Connecting Ducts Knock OutsOutdoor Combustion Air Method Confined Space Installation RequirementsIndoor Combustion Air Unconfined Space Ventilation Air Venting and Combustion Air CheckMake the Following Check For Two Pipe Installation Direct Vent Dual Certified Direct or Non- Direct VentContaminated Combustion Air Combustion Air and Vent Piping Insulation Guidelines Sizing Combustion Air and Vent PipeVent Termination Clearances Single Piping onlyDirect Vent Termination Clearance Other than Direct Vent Termination Clearance Condensate Drain Trap Frozen and Burst Water Pipe HazardUpflow Installations Top Vent See Fig OnlyUpflow Installations Vent through Left-Side See Fig Side ViewAll Models Vent through Right-Side See Fig PVCDownflow Left-Side Vent and Trap See Fig ExhaustDownflow Right-Side Vent and Trap See Fig Downflow Right-Side Vent and TrapHorizontal Left through Top See Fig ExhaustHorizontal Left-Side Vent See Fig InletHorizontal Right through Top See Fig Horizontal Right through TopHorizontal Right-Side Vent See Fig ExhaustConnecting Vent and Combustion Air Piping Combustion Air Pipe Connection Direct VentVent Pipe Connection Connecting Vent Pipes and Termination Joining Pipe and FittingsHorizontal Termination Vent Termination Shielding Using Exterior RisersVertical Termination Multi Vent Termination ClearancesConcentric Vent and Combustion-Air Concentric Vent Termination Vertical & Horizontal TerminationCarbon Monoxide POISONING, Fire and Explosion Hazard 40,000, 50,000, 60,000, & 75,000 Btuh Furnaces Fire and Explosion Hazard Gas Piping RequirementsGas Supply Requirements Fire HazardElectrical Operation Hazard Typical Gas Piping for UpflowGeneral Derating Rules High Altitude Air Pressure SwitchPropane Conversion Additional Propane Connection RequirementsChanging Orifices for High Altitude Electrical SHOCK, Fire or Explosion HazardJunction Box J- Box Relocation Power Supply WiringFinal Gas Piping Check Thermostat HeatingFurnace Control Fuse CoolingOptional Equipment Tap Select Interface BoardSizing InstallationConnections InsulationFilter Installation using Filter Rack FiltersAddition Of Air Conditioning Combustible Floor Installation Subbase for Combustible FloorManifold Gas Pressure Adjustments StartupGas Supply Pressure Temperature Rise Check Natural Gas Input Rating CheckMain Burner Flame Check Hard Wired Continuous Fan Operation Blower AdjustmentsContinuous- Fan using G Changing Blower SpeedOn = OFF = Low Cooling Y1 Request High Cooling Y1 & Y/Y2 or Y/Y2 RequestContinuous Circulating Fan G Request Furnace Control Board Diagnostic Codes See Fig Heating Request with Gas Shut OffWiring Diagram Thermostat Wiring Guide No Connection SINGLE-STAGE Thermostat TWO-STAGE Catalog No 58HDV---01SI