New Buck Corporation 20 Room Heater manual Minimum Clearance to Combustibles, Increaser

Page 27

MINIMUM CLEARANCE TO COMBUSTIBLES

INCREASER

FIGURE 2

PACK TIGHT WITH CERAMIC

WOOL (DO NOT USE GLASS

WOOL).

6” FLEX PIPE OR ADJUSTABLE ELBOW

FIGURE 3

C. Sealing Trim Kit

1.This third method of installation is to use the masonry fireplace trim kit to seal the stove to the Pre-Fab fireplace.

CAUTION! Although this method is a tested and approved method, some codes may not allow this type installation so be sure to check local codes for approval prior to making this type of installation.

Image 27
Contents Page Table of Contents Page Operating Controls Room Heater FeaturesCatalyst Equipped Catalyst WarrantyAchieving Catalytic LIGHT-OFF When Refueling EPA Compliance StatusDo Not Over-fire This Heater Catalyst MonitoringMaintain Proper Draft ASH RemovalFireplace Insert Masonry Insert Installation Installation PrecautionsMinimum Clearances Alternate Floor Protectors MaterialsMaterial Required Thickness Required Fireplace Dimensions Possible Tools Needed for InstallationInstallation Preparation Page Mounting Trim Panels Final Check Installation Precaution Residential Freestanding Room Heater InstallationFloor Protection Wall Installation Corner InstallationPreparing the Stove for Installation Tools for InstallationDetermining the Chimney Location Ceiling Exit Using Single Wall PipePreparing the Room Heater Location ChimneyWall Exit Into Masonry Using Single Wall Pipe Wall Exit into Metal Tee-BoxFlue Exit Ceiling Final Check Mobile Home Room Heater Installation Sleeping RoomModel Wall Installation Preparing the Heater for Installation Protective PAD Outside AIR Pedestal KIT Outside AIR Duct Rain CAP PRE-FAB Fireplace Insert PRE-FAB Insert InstallationMinimum Clearances Installation Preparation Installation PrecautionsHeater Preparation Increaser Minimum Clearance to CombustiblesPage Safety Precautions Wood Heater SafetyOperation Building a FireModel 20 Operation Align where handle rod exits face of air vent Type Ease Coaling Amount Wood Starting Qualities Sparks Operating and Safety HintsHelpful Hints Tips on Fire BurningPreventive Maintenance / Parts Replacement Cleaning the HeaterCatalytic Inspection Catalyst Replacement Off-Season Replacement Recommended Door Gasket Replacement Cold Heater Page Contents Catalytic TroubleshootingDefinitions Possible Problems Follow New Buck TroubleshootingHeater Related Problems Problem Possible Cause SolutionProblem Possible Cause Solution CHIMNEY-RELATED Problems Problem Possible CauseProblem Possible Cause Less than Greater Inches Than COMBUSTOR-RELATED Problems Within a combustor can PI-ZC20660 Safety NoticeNEW Buck Corporation This is not a FireplaceDescription Residential Installations Parts RequirementsInstallation Precautions Listed NEW Buck Corp Model Part DescriptionSelecting a Chimney Installation and Location Through Ceiling Through CathedralCeiling Framing Construction and Installation Page ZC20/Model Factors of Alternate Materials Alternate Floor Protectors MaterialsTOP Front Trim Panel Parts Requirements Mobile Home InstallationsCorner Interior Location Rain CAP Storm MAX Factors of Alternate Materials Cleaning the Unit Preventive Maintenance Safety Precautions Chimney Chimney CleaningCREOSOTE-FORMATION and Need for Removal NEW Buck Corporation Warranty Time PeriodsProcedure Products not Covered