TOP FRONT TRIM PANEL
HEATER POWER CORD
BRASS TRIM
RIGHT SIDE TRIM
PANEL
BLACK
WHITE
GROUND
REAR COVER PLATE
RECEPTACLE BOX
FIGURE 7 POWER HOOK-UP
10.Now, finish the wall around the ZC20 using brick, rock, sheetrock, paneling, or any type finishing material. CAUTION: Do not block any openings designed into the unit.
11.Install a mantel above the unit if desired. Note that a combustible mantel must be positioned at least 12” above the top of the ZC20 cabinet.