New Buck Corporation 20 Room Heater manual Max

Page 58

Optional

Fire Code Sheet Rock

And Metal Fire Stop

2 In.

Min.

TOPPER

STORM COLLAR

ROOF FLASHING

TRIPLE WALL PIPE

CAUTION: Refer to chim- ney manufactures instruc- tions for assembly and disas- sembly of chimney parts. Be sure to follow chimney instructions for proper clear- ances to combustibles and proper air spacing required.

Ceiling

NOTE: Follow building and fire codes for each indi- vidual state.

15FT.

MAX.

NBC

RADIATION

SHIELD

Chase

Enclosure

2 “X 4” STUDDING

USE FIRE CODE SHEET ROCK

NBC METAL FIRE STOP RADIA-

TION SHIELD

2”X 4” STUDDING

A SINGLE HEADER MUST BE

INSTALLED ABOVE CABINET

34 5/8”

THESE MEASUREMENTS

ARE CRITICAL

37 15/16”

17”

WARNING: Install the hearth protec- tor only as specified. The hearth exten- sion must extend a minimum of 17” in front of the fireplace opening and must be 37 15/16” wide minimum.

FIGURE 10

CHASE ENCLOSURE AND CORNER LOCATION FRAMING

7.Next construct the hearth extension out of non-combustible inorganic building materials as follows:

a)The hearth extension must extend 17” in front of the rough framed opening on the ZC20.

b)The hearth extension width must be at least 37 15/16”.

c)The hearth extension must be made of brick 2” thick, a listed “Hearth Extension” or “Floor Protector”, or a hearth extension made of non-combustible inorganic material with a K* factor of:

K = 2.5 BTU ((HR) (ft2) (oF/in.))

ALTERNATE FLOOR PROTECTORS MATERIALS

With the floor protector or hearth extension material specified as one layer of 2” thick brick with a K* factor of 5.0, you may use alternate materials as long as the K* factor (s) is calculated as follows:

Formula: Required thickness = (K of alternate material/K of millboard) X (thickness of millboard)

Example: An alternate inorganic non-combustible millboard with a K of .9375 would require a thickness as follows:

Required thickness = .9375.0o x 2 inch = 3/8 inch

Image 58
Contents Page Table of Contents Page Room Heater Features Operating ControlsEPA Compliance Status Catalyst WarrantyAchieving Catalytic LIGHT-OFF When Refueling Catalyst EquippedASH Removal Catalyst MonitoringMaintain Proper Draft Do Not Over-fire This HeaterMasonry Insert Installation Installation Precautions Fireplace InsertAlternate Floor Protectors Materials Minimum ClearancesMaterial Required Thickness Possible Tools Needed for Installation Required Fireplace DimensionsInstallation Preparation Page Mounting Trim Panels Final Check Residential Freestanding Room Heater Installation Installation PrecautionWall Installation Corner Installation Floor ProtectionTools for Installation Preparing the Stove for InstallationChimney Ceiling Exit Using Single Wall PipePreparing the Room Heater Location Determining the Chimney LocationWall Exit into Metal Tee-Box Wall Exit Into Masonry Using Single Wall PipeFlue Exit Ceiling Final Check Sleeping Room Mobile Home Room Heater InstallationModel Wall Installation Preparing the Heater for Installation Protective PAD Outside AIR Pedestal KIT Outside AIR Duct Rain CAP Installation Precautions PRE-FAB Insert InstallationMinimum Clearances Installation Preparation PRE-FAB Fireplace InsertHeater Preparation Minimum Clearance to Combustibles IncreaserPage Wood Heater Safety Safety PrecautionsBuilding a Fire OperationModel 20 Operation Align where handle rod exits face of air vent Tips on Fire Burning Operating and Safety HintsHelpful Hints Type Ease Coaling Amount Wood Starting Qualities SparksCleaning the Heater Preventive Maintenance / Parts ReplacementCatalytic Inspection Catalyst Replacement Off-Season Replacement Recommended Door Gasket Replacement Cold Heater Page Catalytic Troubleshooting ContentsDefinitions Possible Problems Problem Possible Cause Solution TroubleshootingHeater Related Problems Follow New BuckProblem Possible Cause Solution Problem Possible Cause CHIMNEY-RELATED ProblemsProblem Possible Cause Less than Greater Inches Than COMBUSTOR-RELATED Problems Within a combustor can This is not a Fireplace Safety NoticeNEW Buck Corporation PI-ZC20660Listed NEW Buck Corp Model Part Description Residential Installations Parts RequirementsInstallation Precautions DescriptionThrough Ceiling Through Cathedral Selecting a Chimney Installation and LocationCeiling Framing Construction and Installation Page ZC20/Model Alternate Floor Protectors Materials Factors of Alternate MaterialsTOP Front Trim Panel Mobile Home Installations Parts RequirementsCorner Interior Location Rain CAP Storm MAX Factors of Alternate Materials Cleaning the Unit Chimney Cleaning Preventive Maintenance Safety Precautions ChimneyCREOSOTE-FORMATION and Need for Removal Products not Covered Warranty Time PeriodsProcedure NEW Buck Corporation