F.DO NOT build a fire directly inside the ZC20. It is designed solely for housing the Model 20.

G.WARNING: Do not install in sleeping room.

H.CAUTION: The structural integrity of the mobile home floor, wall, and ceiling/roof must be maintained.

I.Do not connect this unit to a chimney serving another appliance.

FRAMING CONSTRUCTION AND INSTALLATION

Except as noted, the ZC20 can be installed almost anywhere you desire. There are, however, a few clearance and framing restrictions that must be followed. See Figure 5 and 6 to make sure that these clearance restrictions are met. It is much wiser to place your ZC20 correctly at the start of the installation than to be forced to relocate it after much of the work is done.

You must ensure that the floor is of adequate strength to accept the load of this unit. If inadequate, the floor will require additional support, such as bracing. NOTE: A wooden base constructed of plywood or 2”x4” boards is required in order to get proper clearance above the extended hearth (millboard, rock, stone, etc.)

Where cabinet is to be placed, a 4 1/4” diameter hole with a 2 1/8” radius from center line must be cut through floor. Outside air duct kit #PP 70075-01 is be installed. (See Figure 9.)

 

25”

CORNER

INTERIOR LOCATION

LOCATION

 

FIGURE 8

1.Thoroughly clean the area where the unit will be placed. Remove any carpeting/padding from the area where the ZC20 will be installed.

2.Layout the location on the floor for ZC cabinet. NOTE: Maintain 3/4” clearance between the rear of the cabinet and combustible material.

3.Layout for hearth extension preparation and removal of carpet and padding . Where cabinet is to be placed, a 4 1/4” diameter hole with a 2 1/8” radius from center line must be cut through floor. Outside air duct kit # PP 70075-01 is to be installed. (See Figure 9.)

4.Next, a sheet metal safety shield is placed 1 1/2” under the front of the cabinet. It must extend out under the floor protector. Drop a plumb line, locate and mark point on ceiling directly over center of ZC20 chimney adapter. After locating the center of hole, install firestop spacer per chimney manufacturer’s instructions.

Image 56
Contents Page Table of Contents Page Room Heater Features Operating ControlsCatalyst Warranty Achieving Catalytic LIGHT-OFF When RefuelingEPA Compliance Status Catalyst EquippedCatalyst Monitoring Maintain Proper DraftASH Removal Do Not Over-fire This HeaterMasonry Insert Installation Installation Precautions Fireplace InsertMaterial Required Thickness Minimum ClearancesAlternate Floor Protectors Materials Installation Preparation Required Fireplace DimensionsPossible Tools Needed for Installation Page Mounting Trim Panels Final Check Residential Freestanding Room Heater Installation Installation PrecautionWall Installation Corner Installation Floor ProtectionTools for Installation Preparing the Stove for InstallationCeiling Exit Using Single Wall Pipe Preparing the Room Heater LocationChimney Determining the Chimney LocationFlue Exit Wall Exit Into Masonry Using Single Wall PipeWall Exit into Metal Tee-Box Ceiling Final Check Model Mobile Home Room Heater InstallationSleeping Room Wall Installation Preparing the Heater for Installation Protective PAD Outside AIR Pedestal KIT Outside AIR Duct Rain CAP PRE-FAB Insert Installation Minimum Clearances Installation PreparationInstallation Precautions PRE-FAB Fireplace InsertHeater Preparation Minimum Clearance to Combustibles IncreaserPage Wood Heater Safety Safety PrecautionsModel 20 Operation OperationBuilding a Fire Align where handle rod exits face of air vent Operating and Safety Hints Helpful HintsTips on Fire Burning Type Ease Coaling Amount Wood Starting Qualities SparksCatalytic Inspection Preventive Maintenance / Parts ReplacementCleaning the Heater Catalyst Replacement Off-Season Replacement Recommended Door Gasket Replacement Cold Heater Page Catalytic Troubleshooting ContentsDefinitions Possible Problems Troubleshooting Heater Related ProblemsProblem Possible Cause Solution Follow New BuckProblem Possible Cause Solution Problem Possible Cause CHIMNEY-RELATED ProblemsProblem Possible Cause Less than Greater Inches Than COMBUSTOR-RELATED Problems Within a combustor can Safety Notice NEW Buck CorporationThis is not a Fireplace PI-ZC20660Residential Installations Parts Requirements Installation PrecautionsListed NEW Buck Corp Model Part Description DescriptionCeiling Selecting a Chimney Installation and LocationThrough Ceiling Through Cathedral Framing Construction and Installation Page ZC20/Model Alternate Floor Protectors Materials Factors of Alternate MaterialsTOP Front Trim Panel Mobile Home Installations Parts RequirementsCorner Interior Location Rain CAP Storm MAX Factors of Alternate Materials Cleaning the Unit CREOSOTE-FORMATION and Need for Removal Preventive Maintenance Safety Precautions ChimneyChimney Cleaning Warranty Time Periods ProcedureProducts not Covered NEW Buck Corporation