New Buck Corporation 20 Room Heater manual Rain CAP Storm

Page 57

5.Obtain the Listed and Approved Chimney Installation instructions and follow exactly.

a)Obtain the starter section of pipe and install on the ZC20 cabinet. It my be necessary to crimp the inside of the starter pipe to ease installation into the ZC20 cabinet.

b)Obtain the two short sheet metal “ell” brackets and sheet metal screws provided with the ZC20 and secure the starter section of pipe to the ZC20 cabinet.

c)Add applicable lengths of chimney extending through the roof until the following conditions are met:

1.The chimney must extend a minimum of 3’ above the highest point where it penetrates the roof.

2.The chimney must extend a minimum of 2’ higher than any portion of the building within 10’ of the chimney but not to exceed 15’ above the hearth.

d)Install the flashing, storm collar, and chimney cap as indicated in the manufacturer’s installation instructions.

6.The ZC20 Cabinet is now ready for framing as follows:

a)Frame the ZC20 using 2”x4” studs or local building code framing. Some minor framing restrictions are required:

1.Adjacent side walls must be at least 17” from the outer edge of the ZC20 trim panel.

2.The overall opening dimensions must be at least 37 15/16” wide and 34 5/8” high.

b)2”x4” framing above the unit must be turned flat. This allows proper clearance from framing to chimney (2” minimum). (See Figure 10.)

RAIN CAP

STORM

2 ft. COLLAR

FLASHING

NEW BUCK

FIRE STOP

RADIATION

SHIELD

OUTSIDE AIR

DUCT THROUGH

UNDERPINNING

RAIN CAP

2 ft.

 

STORM COLLAR

3 ft. Typical

FLASHING

 

NEW BUCK

20 ft. Max.

FIRE STOP

(Typical)

RADIATION

 

SHIELD

 

OUTSIDE AIR DUCT

THROUGH FLOOR

WHEN MOBILE

HOME IS NOT UN-

DERPINNED

FIGURE 9

Image 57
Contents Page Table of Contents Page Operating Controls Room Heater FeaturesAchieving Catalytic LIGHT-OFF When Refueling Catalyst WarrantyEPA Compliance Status Catalyst EquippedMaintain Proper Draft Catalyst MonitoringASH Removal Do Not Over-fire This HeaterFireplace Insert Masonry Insert Installation Installation PrecautionsMinimum Clearances Alternate Floor Protectors MaterialsMaterial Required Thickness Required Fireplace Dimensions Possible Tools Needed for InstallationInstallation Preparation Page Mounting Trim Panels Final Check Installation Precaution Residential Freestanding Room Heater InstallationFloor Protection Wall Installation Corner InstallationPreparing the Stove for Installation Tools for InstallationPreparing the Room Heater Location Ceiling Exit Using Single Wall PipeChimney Determining the Chimney LocationWall Exit Into Masonry Using Single Wall Pipe Wall Exit into Metal Tee-BoxFlue Exit Ceiling Final Check Mobile Home Room Heater Installation Sleeping RoomModel Wall Installation Preparing the Heater for Installation Protective PAD Outside AIR Pedestal KIT Outside AIR Duct Rain CAP Minimum Clearances Installation Preparation PRE-FAB Insert InstallationInstallation Precautions PRE-FAB Fireplace InsertHeater Preparation Increaser Minimum Clearance to CombustiblesPage Safety Precautions Wood Heater SafetyOperation Building a FireModel 20 Operation Align where handle rod exits face of air vent Helpful Hints Operating and Safety HintsTips on Fire Burning Type Ease Coaling Amount Wood Starting Qualities SparksPreventive Maintenance / Parts Replacement Cleaning the HeaterCatalytic Inspection Catalyst Replacement Off-Season Replacement Recommended Door Gasket Replacement Cold Heater Page Contents Catalytic TroubleshootingDefinitions Possible Problems Heater Related Problems TroubleshootingProblem Possible Cause Solution Follow New BuckProblem Possible Cause Solution CHIMNEY-RELATED Problems Problem Possible CauseProblem Possible Cause Less than Greater Inches Than COMBUSTOR-RELATED Problems Within a combustor can NEW Buck Corporation Safety NoticeThis is not a Fireplace PI-ZC20660Installation Precautions Residential Installations Parts RequirementsListed NEW Buck Corp Model Part Description DescriptionSelecting a Chimney Installation and Location Through Ceiling Through CathedralCeiling Framing Construction and Installation Page ZC20/Model Factors of Alternate Materials Alternate Floor Protectors MaterialsTOP Front Trim Panel Parts Requirements Mobile Home InstallationsCorner Interior Location Rain CAP Storm MAX Factors of Alternate Materials Cleaning the Unit Preventive Maintenance Safety Precautions Chimney Chimney CleaningCREOSOTE-FORMATION and Need for Removal Procedure Warranty Time PeriodsProducts not Covered NEW Buck Corporation