New Buck Corporation 20 Room Heater manual

Page 36
Image 36
Contents Page Table of Contents Page Room Heater Features Operating ControlsCatalyst Warranty Achieving Catalytic LIGHT-OFF When RefuelingEPA Compliance Status Catalyst EquippedCatalyst Monitoring Maintain Proper DraftASH Removal Do Not Over-fire This HeaterMasonry Insert Installation Installation Precautions Fireplace InsertMinimum Clearances Alternate Floor Protectors MaterialsMaterial Required Thickness Required Fireplace Dimensions Possible Tools Needed for InstallationInstallation Preparation Page Mounting Trim Panels Final Check Residential Freestanding Room Heater Installation Installation PrecautionWall Installation Corner Installation Floor ProtectionTools for Installation Preparing the Stove for InstallationCeiling Exit Using Single Wall Pipe Preparing the Room Heater LocationChimney Determining the Chimney LocationWall Exit Into Masonry Using Single Wall Pipe Wall Exit into Metal Tee-BoxFlue Exit Ceiling Final Check Mobile Home Room Heater Installation Sleeping RoomModel Wall Installation Preparing the Heater for Installation Protective PAD Outside AIR Pedestal KIT Outside AIR Duct Rain CAP PRE-FAB Insert Installation Minimum Clearances Installation PreparationInstallation Precautions PRE-FAB Fireplace InsertHeater Preparation Minimum Clearance to Combustibles IncreaserPage Wood Heater Safety Safety PrecautionsOperation Building a FireModel 20 Operation Align where handle rod exits face of air vent Operating and Safety Hints Helpful HintsTips on Fire Burning Type Ease Coaling Amount Wood Starting Qualities SparksPreventive Maintenance / Parts Replacement Cleaning the HeaterCatalytic Inspection Catalyst Replacement Off-Season Replacement Recommended Door Gasket Replacement Cold Heater Page Catalytic Troubleshooting ContentsDefinitions Possible Problems Troubleshooting Heater Related ProblemsProblem Possible Cause Solution Follow New BuckProblem Possible Cause Solution Problem Possible Cause CHIMNEY-RELATED ProblemsProblem Possible Cause Less than Greater Inches Than COMBUSTOR-RELATED Problems Within a combustor can Safety Notice NEW Buck CorporationThis is not a Fireplace PI-ZC20660Residential Installations Parts Requirements Installation PrecautionsListed NEW Buck Corp Model Part Description DescriptionSelecting a Chimney Installation and Location Through Ceiling Through CathedralCeiling Framing Construction and Installation Page ZC20/Model Alternate Floor Protectors Materials Factors of Alternate MaterialsTOP Front Trim Panel Mobile Home Installations Parts RequirementsCorner Interior Location Rain CAP Storm MAX Factors of Alternate Materials Cleaning the Unit Preventive Maintenance Safety Precautions Chimney Chimney CleaningCREOSOTE-FORMATION and Need for Removal Warranty Time Periods ProcedureProducts not Covered NEW Buck Corporation