New Buck Corporation 20 Room Heater manual Less than Greater Inches Than

Page 44

3 FT.

METAL

CHIMNEY

LESS THAN

GREATER

10 INCHES

THAN

10 FT.

10 FT. 2 FT.

2 FT.

2 FT. MINIMUM HEIGHT ABOVE THE ROOF WITHIN 10 FT. HORIZONTALLY

3 FT.

MASONRY

CHIMNEY

CHIMNEY “10 FT.” RULE (MINIMUM HEIGHTS)

Stack wood in criss-cross pattern under a shelter to allow air flow to dry the wood and to keep wood from rain. Green wood may have 50-60% moisture content. Wood seasoned outside uncovered may have 40% moisture content. Wood properly seasoned in a covered environment will have less than 20% moisture content.

Image 44
Contents Page Table of Contents Page Room Heater Features Operating ControlsCatalyst Warranty Achieving Catalytic LIGHT-OFF When RefuelingEPA Compliance Status Catalyst EquippedCatalyst Monitoring Maintain Proper DraftASH Removal Do Not Over-fire This HeaterMasonry Insert Installation Installation Precautions Fireplace InsertMaterial Required Thickness Minimum ClearancesAlternate Floor Protectors Materials Installation Preparation Required Fireplace DimensionsPossible Tools Needed for Installation Page Mounting Trim Panels Final Check Residential Freestanding Room Heater Installation Installation PrecautionWall Installation Corner Installation Floor ProtectionTools for Installation Preparing the Stove for InstallationCeiling Exit Using Single Wall Pipe Preparing the Room Heater LocationChimney Determining the Chimney LocationFlue Exit Wall Exit Into Masonry Using Single Wall PipeWall Exit into Metal Tee-Box Ceiling Final Check Model Mobile Home Room Heater InstallationSleeping Room Wall Installation Preparing the Heater for Installation Protective PAD Outside AIR Pedestal KIT Outside AIR Duct Rain CAP PRE-FAB Insert Installation Minimum Clearances Installation PreparationInstallation Precautions PRE-FAB Fireplace InsertHeater Preparation Minimum Clearance to Combustibles IncreaserPage Wood Heater Safety Safety PrecautionsModel 20 Operation OperationBuilding a Fire Align where handle rod exits face of air vent Operating and Safety Hints Helpful HintsTips on Fire Burning Type Ease Coaling Amount Wood Starting Qualities SparksCatalytic Inspection Preventive Maintenance / Parts ReplacementCleaning the Heater Catalyst Replacement Off-Season Replacement Recommended Door Gasket Replacement Cold Heater Page Catalytic Troubleshooting ContentsDefinitions Possible Problems Troubleshooting Heater Related ProblemsProblem Possible Cause Solution Follow New BuckProblem Possible Cause Solution Problem Possible Cause CHIMNEY-RELATED ProblemsProblem Possible Cause Less than Greater Inches Than COMBUSTOR-RELATED Problems Within a combustor can Safety Notice NEW Buck CorporationThis is not a Fireplace PI-ZC20660Residential Installations Parts Requirements Installation PrecautionsListed NEW Buck Corp Model Part Description DescriptionCeiling Selecting a Chimney Installation and LocationThrough Ceiling Through Cathedral Framing Construction and Installation Page ZC20/Model Alternate Floor Protectors Materials Factors of Alternate MaterialsTOP Front Trim Panel Mobile Home Installations Parts RequirementsCorner Interior Location Rain CAP Storm MAX Factors of Alternate Materials Cleaning the Unit CREOSOTE-FORMATION and Need for Removal Preventive Maintenance Safety Precautions ChimneyChimney Cleaning Warranty Time Periods ProcedureProducts not Covered NEW Buck Corporation