7.The ZC20 cabinet is now ready for framing as follows:

a)Frame the ZC20 using 2”x4” studs or local building code framing. Some minor framing restrictions are required:

1.Adjacent side walls must be at least 16” from the outer edge of the ZC20 trim panel

2.The overall opening dimensions must be at least 37 15/16” wide and 34 5/8” high.

NOTE: Maintain 1 1/2” clearance at the side walls of the cabinet and combustible material.

b)2”x4” framing above the unit must be turned flat. This allows proper clearance from framing to chimney (2” minimum). (See Figure 6.)

ZC20/Model 20

Optional Fire Code

Sheet Rock And

Metal Fire Stop

 

2 In.

 

Min.

 

NBC

 

Radiation

Ceiling

Shied

 

 

15FT. MAX.

NOTE: Follow

CHASE

building and fire

codes for each

ENCLOSE -

individual state.

URE

TOPPER

STORM COLLAR

ROOF FLASHING

TRIPLE WALL PIPE

2”X 4” STUDDING

USE FIRE CODE SHEET

ROCK

NBC METAL FIRE STOP

RADIATION SHIELD

2” X 4” STUDDING

A SINGLE HEADER

MUST BE INSTALLED

ABOVE CABINET

34-5/8”

 

 

 

 

THESE MEASUREMENTS

37-15/16”

 

ARE CRITICAL.

 

 

 

 

 

 

 

 

 

17”

 

 

 

 

 

 

 

 

WARNING: Install the hearth protector only as specified. The hearth extension must extend a minimum of 17” in front of the fire- place opening and must be 37 15/16” wide minimum.

FIGURE 6 CHASE ENCLOSURE AND CORNER LOCATION FRAMING

Image 52
Contents Page Table of Contents Page Room Heater Features Operating ControlsCatalyst Warranty Achieving Catalytic LIGHT-OFF When RefuelingEPA Compliance Status Catalyst EquippedCatalyst Monitoring Maintain Proper DraftASH Removal Do Not Over-fire This HeaterMasonry Insert Installation Installation Precautions Fireplace InsertAlternate Floor Protectors Materials Minimum ClearancesMaterial Required Thickness Possible Tools Needed for Installation Required Fireplace DimensionsInstallation Preparation Page Mounting Trim Panels Final Check Residential Freestanding Room Heater Installation Installation PrecautionWall Installation Corner Installation Floor ProtectionTools for Installation Preparing the Stove for InstallationCeiling Exit Using Single Wall Pipe Preparing the Room Heater LocationChimney Determining the Chimney LocationWall Exit into Metal Tee-Box Wall Exit Into Masonry Using Single Wall PipeFlue Exit Ceiling Final Check Sleeping Room Mobile Home Room Heater InstallationModel Wall Installation Preparing the Heater for Installation Protective PAD Outside AIR Pedestal KIT Outside AIR Duct Rain CAP PRE-FAB Insert Installation Minimum Clearances Installation PreparationInstallation Precautions PRE-FAB Fireplace InsertHeater Preparation Minimum Clearance to Combustibles IncreaserPage Wood Heater Safety Safety PrecautionsBuilding a Fire OperationModel 20 Operation Align where handle rod exits face of air vent Operating and Safety Hints Helpful HintsTips on Fire Burning Type Ease Coaling Amount Wood Starting Qualities SparksCleaning the Heater Preventive Maintenance / Parts ReplacementCatalytic Inspection Catalyst Replacement Off-Season Replacement Recommended Door Gasket Replacement Cold Heater Page Catalytic Troubleshooting ContentsDefinitions Possible Problems Troubleshooting Heater Related ProblemsProblem Possible Cause Solution Follow New BuckProblem Possible Cause Solution Problem Possible Cause CHIMNEY-RELATED ProblemsProblem Possible Cause Less than Greater Inches Than COMBUSTOR-RELATED Problems Within a combustor can Safety Notice NEW Buck CorporationThis is not a Fireplace PI-ZC20660Residential Installations Parts Requirements Installation PrecautionsListed NEW Buck Corp Model Part Description DescriptionThrough Ceiling Through Cathedral Selecting a Chimney Installation and LocationCeiling Framing Construction and Installation Page ZC20/Model Alternate Floor Protectors Materials Factors of Alternate MaterialsTOP Front Trim Panel Mobile Home Installations Parts RequirementsCorner Interior Location Rain CAP Storm MAX Factors of Alternate Materials Cleaning the Unit Chimney Cleaning Preventive Maintenance Safety Precautions ChimneyCREOSOTE-FORMATION and Need for Removal Warranty Time Periods ProcedureProducts not Covered NEW Buck Corporation