New Buck Corporation 20 Room Heater manual

Page 28

2.To complete this installation, follow the basic masonry fireplace trim kit installation instructions except:

The trim kit may have to be cut down in size so as not to block any cooling vents/chambers of the Pre- Fab Fireplace.

3.To complete methods 1 and 2:

Position the heater into the Pre-Fab Fireplace and center the flue exit under the connector.

4.Slide the connector (or slip connector) down into the flue exit of the heater approximately 3/8”. Check that the damper operates without hitting the connector. Now, seal the connector to the heater (and fireplace throat if method #1 is used) using refractory cement.

CAUTION! Do not loosen the ceramic blanket.

5.CAUTION! Crimped end of connector must be placed into the heater throat.

6.Check installation minimum clearances and install an approved heater extension or floor protector to meet at least the minimum clearances.

This heater is now ready for use. Please read the heater operation Section VII of this manual before burning a fire in the heater.

Image 28
Contents Page Table of Contents Page Room Heater Features Operating ControlsCatalyst Warranty Achieving Catalytic LIGHT-OFF When RefuelingEPA Compliance Status Catalyst EquippedCatalyst Monitoring Maintain Proper DraftASH Removal Do Not Over-fire This HeaterMasonry Insert Installation Installation Precautions Fireplace InsertAlternate Floor Protectors Materials Minimum ClearancesMaterial Required Thickness Possible Tools Needed for Installation Required Fireplace DimensionsInstallation Preparation Page Mounting Trim Panels Final Check Residential Freestanding Room Heater Installation Installation PrecautionWall Installation Corner Installation Floor ProtectionTools for Installation Preparing the Stove for InstallationCeiling Exit Using Single Wall Pipe Preparing the Room Heater LocationChimney Determining the Chimney LocationWall Exit into Metal Tee-Box Wall Exit Into Masonry Using Single Wall PipeFlue Exit Ceiling Final Check Sleeping Room Mobile Home Room Heater InstallationModel Wall Installation Preparing the Heater for Installation Protective PAD Outside AIR Pedestal KIT Outside AIR Duct Rain CAP PRE-FAB Insert Installation Minimum Clearances Installation PreparationInstallation Precautions PRE-FAB Fireplace InsertHeater Preparation Minimum Clearance to Combustibles IncreaserPage Wood Heater Safety Safety PrecautionsBuilding a Fire OperationModel 20 Operation Align where handle rod exits face of air vent Operating and Safety Hints Helpful HintsTips on Fire Burning Type Ease Coaling Amount Wood Starting Qualities SparksCleaning the Heater Preventive Maintenance / Parts ReplacementCatalytic Inspection Catalyst Replacement Off-Season Replacement Recommended Door Gasket Replacement Cold Heater Page Catalytic Troubleshooting ContentsDefinitions Possible Problems Troubleshooting Heater Related ProblemsProblem Possible Cause Solution Follow New BuckProblem Possible Cause Solution Problem Possible Cause CHIMNEY-RELATED ProblemsProblem Possible Cause Less than Greater Inches Than COMBUSTOR-RELATED Problems Within a combustor can Safety Notice NEW Buck CorporationThis is not a Fireplace PI-ZC20660Residential Installations Parts Requirements Installation PrecautionsListed NEW Buck Corp Model Part Description DescriptionThrough Ceiling Through Cathedral Selecting a Chimney Installation and LocationCeiling Framing Construction and Installation Page ZC20/Model Alternate Floor Protectors Materials Factors of Alternate MaterialsTOP Front Trim Panel Mobile Home Installations Parts RequirementsCorner Interior Location Rain CAP Storm MAX Factors of Alternate Materials Cleaning the Unit Chimney Cleaning Preventive Maintenance Safety Precautions ChimneyCREOSOTE-FORMATION and Need for Removal Warranty Time Periods ProcedureProducts not Covered NEW Buck Corporation