New Buck Corporation 20 Room Heater Safety Notice, NEW Buck Corporation, This is not a Fireplace

Page 47

Zero Clearance Cabinet

Model ZC20

For use with Fireplace Model 20 only

FEATURES

PREPARATION INSTALLATION

OPERATION MAINTENANCE SAFETY

Contact your insurance company for coverage and installation inspection

SAFETY NOTICE

If this cabinet and intended fireplace are not properly installed, a house fire may result. For your safety, follow the installation directions. Contact local building or fire officials about restrictions and installation inspection requirements in your area.

“WARNING”

“THIS IS NOT A FIREPLACE”

Do not attempt to build a fire in this product. It has been designed and safety tested for use only with Model 20 manufactured by New Buck Corporation. Read and follow the installation and operating instructions for this model. Do not remove or cover this label.

© NEW BUCK CORPORATION 1990

PI-ZC20660

Image 47
Contents Page Table of Contents Page Operating Controls Room Heater FeaturesCatalyst Equipped Catalyst WarrantyAchieving Catalytic LIGHT-OFF When Refueling EPA Compliance StatusDo Not Over-fire This Heater Catalyst MonitoringMaintain Proper Draft ASH RemovalFireplace Insert Masonry Insert Installation Installation PrecautionsMaterial Required Thickness Minimum ClearancesAlternate Floor Protectors Materials Installation Preparation Required Fireplace DimensionsPossible Tools Needed for Installation Page Mounting Trim Panels Final Check Installation Precaution Residential Freestanding Room Heater InstallationFloor Protection Wall Installation Corner InstallationPreparing the Stove for Installation Tools for InstallationDetermining the Chimney Location Ceiling Exit Using Single Wall PipePreparing the Room Heater Location ChimneyFlue Exit Wall Exit Into Masonry Using Single Wall PipeWall Exit into Metal Tee-Box Ceiling Final Check Model Mobile Home Room Heater InstallationSleeping Room Wall Installation Preparing the Heater for Installation Protective PAD Outside AIR Pedestal KIT Outside AIR Duct Rain CAP PRE-FAB Fireplace Insert PRE-FAB Insert InstallationMinimum Clearances Installation Preparation Installation PrecautionsHeater Preparation Increaser Minimum Clearance to CombustiblesPage Safety Precautions Wood Heater SafetyModel 20 Operation OperationBuilding a Fire Align where handle rod exits face of air vent Type Ease Coaling Amount Wood Starting Qualities Sparks Operating and Safety HintsHelpful Hints Tips on Fire BurningCatalytic Inspection Preventive Maintenance / Parts ReplacementCleaning the Heater Catalyst Replacement Off-Season Replacement Recommended Door Gasket Replacement Cold Heater Page Contents Catalytic TroubleshootingDefinitions Possible Problems Follow New Buck TroubleshootingHeater Related Problems Problem Possible Cause SolutionProblem Possible Cause Solution CHIMNEY-RELATED Problems Problem Possible CauseProblem Possible Cause Less than Greater Inches Than COMBUSTOR-RELATED Problems Within a combustor can PI-ZC20660 Safety NoticeNEW Buck Corporation This is not a FireplaceDescription Residential Installations Parts RequirementsInstallation Precautions Listed NEW Buck Corp Model Part DescriptionCeiling Selecting a Chimney Installation and LocationThrough Ceiling Through Cathedral Framing Construction and Installation Page ZC20/Model Factors of Alternate Materials Alternate Floor Protectors MaterialsTOP Front Trim Panel Parts Requirements Mobile Home InstallationsCorner Interior Location Rain CAP Storm MAX Factors of Alternate Materials Cleaning the Unit CREOSOTE-FORMATION and Need for Removal Preventive Maintenance Safety Precautions ChimneyChimney Cleaning NEW Buck Corporation Warranty Time PeriodsProcedure Products not Covered