New Buck Corporation 20 Room Heater manual Selecting a Chimney Installation and Location, Ceiling

Page 49

F.DO NOT build a fire directly inside the ZC Cabinet. It is designed solely for housing the Model 20 Stove.

G.WARNING: This fireplace has not been tested for use with a chase above the roof.

H.Do not connect this unit to a chimney serving another appliance.

SELECTING A CHIMNEY INSTALLATION AND LOCATION

There are two basic types of chimney installations possible with the ZC20; straight up through a ceiling, and chase installation, either outside or inside. These are normally used as follows:

CHIMNEY CAP

CHIMNEY CAP

 

 

 

 

CHIMNEY PIPE

 

STORM COLLAR

 

STORM COLLAR

 

 

 

 

FLASHING

 

 

 

CHIMNEY PIPE

 

FLASHING

 

METAL FIRE STOP

 

 

 

 

 

 

 

METAL FIRE STOP

 

METAL FIRE STOP

 

 

 

Z.C. CABINET

 

Z.C. CABINET

FIGURE 1

THROUGH CEILING

FIGURE 2

THROUGH CATHEDRAL

 

CHIMNEY CAP

 

CEILING

 

 

 

 

CHIMNEY PIPE

 

 

 

STORM COLLAR

 

 

 

FLASHING

 

 

 

ELBOWS

 

 

 

ADJUSTABLE CHIMNEY

 

 

METAL FIRE STOP

Z.C. CABINET

CAUTION: Refer to chimney manufacturers instructions for assembly and disassembly of chimney parts. Be sure to

follow chimney instructions for proper clearances to combustibles and proper air spacing required.

FIGURE 3 OFFSET TO CLEAR OBSTRUCTION

Image 49
Contents Page Table of Contents Page Operating Controls Room Heater FeaturesAchieving Catalytic LIGHT-OFF When Refueling Catalyst WarrantyEPA Compliance Status Catalyst EquippedMaintain Proper Draft Catalyst MonitoringASH Removal Do Not Over-fire This HeaterFireplace Insert Masonry Insert Installation Installation PrecautionsAlternate Floor Protectors Materials Minimum ClearancesMaterial Required Thickness Possible Tools Needed for Installation Required Fireplace DimensionsInstallation Preparation Page Mounting Trim Panels Final Check Installation Precaution Residential Freestanding Room Heater InstallationFloor Protection Wall Installation Corner InstallationPreparing the Stove for Installation Tools for InstallationPreparing the Room Heater Location Ceiling Exit Using Single Wall PipeChimney Determining the Chimney LocationWall Exit into Metal Tee-Box Wall Exit Into Masonry Using Single Wall PipeFlue Exit Ceiling Final Check Sleeping Room Mobile Home Room Heater InstallationModel Wall Installation Preparing the Heater for Installation Protective PAD Outside AIR Pedestal KIT Outside AIR Duct Rain CAP Minimum Clearances Installation Preparation PRE-FAB Insert InstallationInstallation Precautions PRE-FAB Fireplace InsertHeater Preparation Increaser Minimum Clearance to CombustiblesPage Safety Precautions Wood Heater SafetyBuilding a Fire OperationModel 20 Operation Align where handle rod exits face of air vent Helpful Hints Operating and Safety HintsTips on Fire Burning Type Ease Coaling Amount Wood Starting Qualities SparksCleaning the Heater Preventive Maintenance / Parts ReplacementCatalytic Inspection Catalyst Replacement Off-Season Replacement Recommended Door Gasket Replacement Cold Heater Page Contents Catalytic TroubleshootingDefinitions Possible Problems Heater Related Problems TroubleshootingProblem Possible Cause Solution Follow New BuckProblem Possible Cause Solution CHIMNEY-RELATED Problems Problem Possible CauseProblem Possible Cause Less than Greater Inches Than COMBUSTOR-RELATED Problems Within a combustor can NEW Buck Corporation Safety NoticeThis is not a Fireplace PI-ZC20660Installation Precautions Residential Installations Parts RequirementsListed NEW Buck Corp Model Part Description DescriptionThrough Ceiling Through Cathedral Selecting a Chimney Installation and LocationCeiling Framing Construction and Installation Page ZC20/Model Factors of Alternate Materials Alternate Floor Protectors MaterialsTOP Front Trim Panel Parts Requirements Mobile Home InstallationsCorner Interior Location Rain CAP Storm MAX Factors of Alternate Materials Cleaning the Unit Chimney Cleaning Preventive Maintenance Safety Precautions ChimneyCREOSOTE-FORMATION and Need for Removal Procedure Warranty Time PeriodsProducts not Covered NEW Buck Corporation