New Buck Corporation 20 Room Heater manual Floor Protection, Wall Installation Corner Installation

Page 14

MINIMUM CLEARANCES

The New Buck Corporation Model 20 must be installed in compliance with the instructions contained in this manual.

CLEARANCE FROM COMBUSTIBLE WALLS AND CEILINGS (Using single wall chimney connector)

The minimum lateral distance between any part of the room heater and combustible walls is shown in Figures 1 and 2.

FIGURE 1

WALL INSTALLATION

FIGURE 2

CORNER INSTALLATION

FLOOR PROTECTION

If a freestanding model is to be installed on a combustible floor, a non-combustible pad must be placed below it to protect the floor from burning material from the stove. The pad must be 36” wide by 37” deep. UL tests were conducted without a floor protector. Therefore, the protector can be of any thickness and any K* factor.

The unit must be positioned on the pad so that there is a minimum of 16” from the front of the door opening to the front of the pad, and a minimum of 8” measured horizontally from the sides of the fuel loading and ash removal openings to the sides of the pad.

NOTE: For clearance reductions using wall protectors, refer to the NFPA -211code.

Image 14
Contents Page Table of Contents Page Room Heater Features Operating ControlsEPA Compliance Status Catalyst WarrantyAchieving Catalytic LIGHT-OFF When Refueling Catalyst EquippedASH Removal Catalyst MonitoringMaintain Proper Draft Do Not Over-fire This HeaterMasonry Insert Installation Installation Precautions Fireplace InsertMaterial Required Thickness Minimum ClearancesAlternate Floor Protectors Materials Installation Preparation Required Fireplace DimensionsPossible Tools Needed for Installation Page Mounting Trim Panels Final Check Residential Freestanding Room Heater Installation Installation PrecautionWall Installation Corner Installation Floor ProtectionTools for Installation Preparing the Stove for InstallationChimney Ceiling Exit Using Single Wall PipePreparing the Room Heater Location Determining the Chimney LocationFlue Exit Wall Exit Into Masonry Using Single Wall PipeWall Exit into Metal Tee-Box Ceiling Final Check Model Mobile Home Room Heater InstallationSleeping Room Wall Installation Preparing the Heater for Installation Protective PAD Outside AIR Pedestal KIT Outside AIR Duct Rain CAP Installation Precautions PRE-FAB Insert InstallationMinimum Clearances Installation Preparation PRE-FAB Fireplace InsertHeater Preparation Minimum Clearance to Combustibles IncreaserPage Wood Heater Safety Safety PrecautionsModel 20 Operation OperationBuilding a Fire Align where handle rod exits face of air vent Tips on Fire Burning Operating and Safety HintsHelpful Hints Type Ease Coaling Amount Wood Starting Qualities SparksCatalytic Inspection Preventive Maintenance / Parts ReplacementCleaning the Heater Catalyst Replacement Off-Season Replacement Recommended Door Gasket Replacement Cold Heater Page Catalytic Troubleshooting ContentsDefinitions Possible Problems Problem Possible Cause Solution TroubleshootingHeater Related Problems Follow New BuckProblem Possible Cause Solution Problem Possible Cause CHIMNEY-RELATED ProblemsProblem Possible Cause Less than Greater Inches Than COMBUSTOR-RELATED Problems Within a combustor can This is not a Fireplace Safety NoticeNEW Buck Corporation PI-ZC20660Listed NEW Buck Corp Model Part Description Residential Installations Parts RequirementsInstallation Precautions DescriptionCeiling Selecting a Chimney Installation and LocationThrough Ceiling Through Cathedral Framing Construction and Installation Page ZC20/Model Alternate Floor Protectors Materials Factors of Alternate MaterialsTOP Front Trim Panel Mobile Home Installations Parts RequirementsCorner Interior Location Rain CAP Storm MAX Factors of Alternate Materials Cleaning the Unit CREOSOTE-FORMATION and Need for Removal Preventive Maintenance Safety Precautions ChimneyChimney Cleaning Products not Covered Warranty Time PeriodsProcedure NEW Buck Corporation