New Buck Corporation 20 Room Heater manual Ceiling

Page 18

(b)Selected or fabricated in accordance with the conditions and clearances as stated in NFPA-211code. Any unexposed metal that is used as part of a wall pass-through system and is exposed to flue gases shall be constructed of stainless steel or other equivalent material that will resist corrosion, softening, or cracking from flue gases at temperatures up to 1800o F.

In addition, a connector to a masonry chimney shall extend through the wall to the inner face or liner but not beyond, and shall be firmly cemented to masonry.

Exception: A thimble may be used to facilitate removal of the chimney connector for cleaning, in which case the thimble shall be permanently cemented in place with high temperature cement.

2.Once the through-the-wall thimble codes are met, simply connect the chimney collar to the wall pass-through connector using #24 ga. minimum blued or black steel connector pipe as follows:

(a)Maintain 1/4” rise per foot (horizontal length) from the appliance to the chimney.

(b)Connect each section so the crimped end faces downward.

(c)Secure each section to each other using at least three (3) sheet metal screws or rivets.

(d)After securing New Buck Corporation Chimney Connector to heater secure pipe to connector with three

(3) screws or rivets.

D.Ceiling Exit-Close Clearance (Using Listed Close Clearance Pipe and 2100o HT Chimney System From Approved Manufacturers List. ) (See page 18)

1.Suspend a plumb bob from the ceiling above the unit so that the weight is hanging in the center of the flue exit. (A small weight on a string will serve as a plumb bob.) Mark the ceiling where the string is suspended to locate the center of the chimney hole.

2.After locating the center of the hole, install the ceiling support box, chimney, flashing, and rain cap.

3.Next, install a New Buck Corp- oration Chimney Connector to the flue of the heater.

4.Connect listed chimney to heater and follow pipe manufacturers installation instructions exactly.

 

NOTE: SEE SIMPSON

 

 

 

 

 

 

 

 

CEILING

 

 

 

DURA-VENT TYPE

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

“DP” CHIMNEY

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

INSTRUCTIONS FOR

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

CEILING SUP-

 

 

INSTALLING CHIM-

 

 

 

 

 

 

 

 

NEY.

 

 

 

 

 

 

PORT BOX

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

SIMPSON DURA-

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

VENT TYPE

 

 

 

 

 

 

 

 

 

 

 

 

 

 

”DVL” DOUBLE

 

NEW BUCK

 

 

 

 

 

 

 

 

 

 

 

 

 

WALL CHIMNEY

 

CORP. CHIM-

 

 

 

 

 

 

 

 

 

 

 

 

 

CONNECTOR

 

NEY CON-

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

NECTOR

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

FIGURE 8

Image 18
Contents Page Table of Contents Page Room Heater Features Operating ControlsEPA Compliance Status Catalyst WarrantyAchieving Catalytic LIGHT-OFF When Refueling Catalyst EquippedASH Removal Catalyst MonitoringMaintain Proper Draft Do Not Over-fire This HeaterMasonry Insert Installation Installation Precautions Fireplace InsertMinimum Clearances Alternate Floor Protectors MaterialsMaterial Required Thickness Required Fireplace Dimensions Possible Tools Needed for InstallationInstallation Preparation Page Mounting Trim Panels Final Check Residential Freestanding Room Heater Installation Installation PrecautionWall Installation Corner Installation Floor ProtectionTools for Installation Preparing the Stove for InstallationChimney Ceiling Exit Using Single Wall PipePreparing the Room Heater Location Determining the Chimney LocationWall Exit Into Masonry Using Single Wall Pipe Wall Exit into Metal Tee-BoxFlue Exit Ceiling Final Check Mobile Home Room Heater Installation Sleeping RoomModel Wall Installation Preparing the Heater for Installation Protective PAD Outside AIR Pedestal KIT Outside AIR Duct Rain CAP Installation Precautions PRE-FAB Insert InstallationMinimum Clearances Installation Preparation PRE-FAB Fireplace InsertHeater Preparation Minimum Clearance to Combustibles IncreaserPage Wood Heater Safety Safety PrecautionsOperation Building a FireModel 20 Operation Align where handle rod exits face of air vent Tips on Fire Burning Operating and Safety HintsHelpful Hints Type Ease Coaling Amount Wood Starting Qualities SparksPreventive Maintenance / Parts Replacement Cleaning the HeaterCatalytic Inspection Catalyst Replacement Off-Season Replacement Recommended Door Gasket Replacement Cold Heater Page Catalytic Troubleshooting ContentsDefinitions Possible Problems Problem Possible Cause Solution TroubleshootingHeater Related Problems Follow New BuckProblem Possible Cause Solution Problem Possible Cause CHIMNEY-RELATED ProblemsProblem Possible Cause Less than Greater Inches Than COMBUSTOR-RELATED Problems Within a combustor can This is not a Fireplace Safety NoticeNEW Buck Corporation PI-ZC20660Listed NEW Buck Corp Model Part Description Residential Installations Parts RequirementsInstallation Precautions DescriptionSelecting a Chimney Installation and Location Through Ceiling Through CathedralCeiling Framing Construction and Installation Page ZC20/Model Alternate Floor Protectors Materials Factors of Alternate MaterialsTOP Front Trim Panel Mobile Home Installations Parts RequirementsCorner Interior Location Rain CAP Storm MAX Factors of Alternate Materials Cleaning the Unit Preventive Maintenance Safety Precautions Chimney Chimney CleaningCREOSOTE-FORMATION and Need for Removal Products not Covered Warranty Time PeriodsProcedure NEW Buck Corporation