New Buck Corporation 20 Room Heater manual Table of Contents

Page 2

TABLE OF CONTENTS

 

SECTION 1:

 

Room Heater Features

3

Important Statements

4

SECTION II:

 

Masonry Insert Installation

6

Minimum Clearances

7

Required Fireplace Dimensions

8

Tools for Installation

8

Installation Preparation: Fireplace

8

Installation Preparation: Heater

8

Installation Procedure—Direct Connect

9

Positioning the Heater

9

Mounting the Trim Panels

9-10

Final Check

11

SECTION III:

 

Freestanding Installation

12

Minimum Clearances

13

Tools for Installation

14

Installation Preparation

14

Determining the Chimney Location

15

Final Check

18

SECTION IV:

 

Mobile Home Installation

19

Parts Requirements

19

Minimum Clearances

20

Tools for Installation

20

Installation Preparation

21

Determining the Chimney Location

22

Final Check

23

SECTION V:

 

Zero-Clearance Installation

24

Minimum Clearances

26

SECTION VI:

 

Safety

28

SECTION VII:

 

Operation

29

Building a Fire

29

Operating and Safety Hints

31

Guide to Burning Qualities of Wood

31

Helpful Hints

31

SECTION VIII:

 

Manufacturer’s Suggested Preventive Maintenance

32

Catalytic Inspection

32

Catalyst Replacement

33

Door Gasket Replacement

34

Electrical Operation

35

SECTION IX:

 

Troubleshooting Guide

36

ZERO-CLEARANCE CABINET MODEL ZC20

46

SECTION I:

 

Residential Installations

47

SECTION II:

 

Mobile Home Installations

54

WARRANTY—Heater

Rear Cover

Image 2
Contents Page Table of Contents Page Room Heater Features Operating ControlsEPA Compliance Status Catalyst WarrantyAchieving Catalytic LIGHT-OFF When Refueling Catalyst EquippedASH Removal Catalyst MonitoringMaintain Proper Draft Do Not Over-fire This HeaterMasonry Insert Installation Installation Precautions Fireplace InsertMaterial Required Thickness Minimum ClearancesAlternate Floor Protectors Materials Installation Preparation Required Fireplace DimensionsPossible Tools Needed for Installation Page Mounting Trim Panels Final Check Residential Freestanding Room Heater Installation Installation PrecautionWall Installation Corner Installation Floor ProtectionTools for Installation Preparing the Stove for InstallationChimney Ceiling Exit Using Single Wall PipePreparing the Room Heater Location Determining the Chimney LocationFlue Exit Wall Exit Into Masonry Using Single Wall PipeWall Exit into Metal Tee-Box Ceiling Final Check Model Mobile Home Room Heater InstallationSleeping Room Wall Installation Preparing the Heater for Installation Protective PAD Outside AIR Pedestal KIT Outside AIR Duct Rain CAP Installation Precautions PRE-FAB Insert InstallationMinimum Clearances Installation Preparation PRE-FAB Fireplace InsertHeater Preparation Minimum Clearance to Combustibles IncreaserPage Wood Heater Safety Safety PrecautionsModel 20 Operation OperationBuilding a Fire Align where handle rod exits face of air vent Tips on Fire Burning Operating and Safety HintsHelpful Hints Type Ease Coaling Amount Wood Starting Qualities SparksCatalytic Inspection Preventive Maintenance / Parts ReplacementCleaning the Heater Catalyst Replacement Off-Season Replacement Recommended Door Gasket Replacement Cold Heater Page Catalytic Troubleshooting ContentsDefinitions Possible Problems Problem Possible Cause Solution TroubleshootingHeater Related Problems Follow New BuckProblem Possible Cause Solution Problem Possible Cause CHIMNEY-RELATED ProblemsProblem Possible Cause Less than Greater Inches Than COMBUSTOR-RELATED Problems Within a combustor can This is not a Fireplace Safety NoticeNEW Buck Corporation PI-ZC20660Listed NEW Buck Corp Model Part Description Residential Installations Parts RequirementsInstallation Precautions DescriptionCeiling Selecting a Chimney Installation and LocationThrough Ceiling Through Cathedral Framing Construction and Installation Page ZC20/Model Alternate Floor Protectors Materials Factors of Alternate MaterialsTOP Front Trim Panel Mobile Home Installations Parts RequirementsCorner Interior Location Rain CAP Storm MAX Factors of Alternate Materials Cleaning the Unit CREOSOTE-FORMATION and Need for Removal Preventive Maintenance Safety Precautions ChimneyChimney Cleaning Products not Covered Warranty Time PeriodsProcedure NEW Buck Corporation