IIe Prepare boiler — place in position
Position boiler After installing vent starter tee, inspecting (replacing if necessary) the gas/air orifice and installing the high altitude kit (if required), move the boiler near its position.
Figure 6 shows the boiler with the front and top panels replaced. These panels may be left off if desired until the installation has been completed.
Refer to Figure 6 for placement sequence:
➀ Wearing heavy gloves, carefully rotate the boiler over onto its base rail legs.
➁ Clip the shipping strap securing the skid to the boiler block assembly. Remove the skid and strap.
➂ Attach the jacket rear panel as shown using (4) #10 x ¾" screws provided in the accessory bag.
Boiler is heavy and contains some sheet metal parts which may have sharp edges. Wear gloves when handling and take proper precautions when moving. Failure to do so will result in severe personal injury, death or substantial property damage.